Operation Quantron E
21
4
4
Operation Quantron E
4.1
Switching on the control unit
Requirements:
The control unit is correctly connected to the fertiliser spreader and the tractor
(
3.3: Connecting the control unit, page 14
).
The voltage is at least
11 V
.
NOTICE
The operator manual describes the functions of the control unit Quantron E
as
of software version 3.30.00
.
n
CAUTION
Risk of injury from discharged fertiliser
Only for mineral fertiliser broadcasters equipped with electronic
control units
In the event of faults, the metering slide could open unexpectedly
en route to the spreading location. There is a danger of people
slipping on the discharged fertiliser and injuring themselves.
Before setting off to the spreading location
you must
switch off the Quantron E electronic control unit.
Summary of Contents for quantron e
Page 8: ...User instructions 1 6...