Remote Control
R&S
®
NGE100B
83
User Manual 5601.1343.02 ─ 02
6.5.7
Fuse Setting
FUSE:DELay
<Delay>
This command defines and queries the fuse delay for the previous selected channel.
Parameters:
<Delay>
{<Delay> | MIN | MAX}
<delay>
0 ms to 10 s (adjustable in 10 ms steps e.g. FUSE:DEL 10 = 10
ms)
MIN
Set fuse delay to minimum.
MAX
Set fuse delay to maximum.
Default unit: ms
Example:
INST OUT1
FUSE:DEL 50
Set fuse delay of channel 1 to 50 ms.
FUSE:DEL? -> 50
Return the fuse delay time of the selected channel.
FUSE:LINK
<arg0>
This command defines or queries the channel fuses (fuse linking) for the previous
selected channel.
Parameters:
<arg0>
{1 | 2 | 3}
1
channel Ch 1
2
channel Ch 2
3
channel Ch 3
Example:
INST OUT1
FUSE:LINK 2
Fuse Ch 1 is linked with Ch 2
FUSE:LINK? 2 -> 1
If the fuse of Ch 1 is linked with Ch 2, a "1" is returned.
FUSE:LINK? 3 -> 0
If the fuse of Ch 1 is not linked with Ch 3, a "0" is returned.
FUSE:TRIPped?
This command queries the fuse tripped of the previous selected channel.
Remote Control - Commands
www.allice.de
Allice Messtechnik GmbH