5.3 MOUNTING AND DISMOUNTING THE HAMMER
REMOVAL FROM CARRIER
Warning! The hammer must be secured from rolling over when disconnecting
from the carrier. Only use a skilled operator to position the carrier for hammer
removal!
Warning! Hydraulic pressure inside the hammer must always be released
before opening hose connections!
Warning! Hot hydraulic fluid can cause severe injuries!
1. Position hammer horizontally on the floor. If the hammer is going to service,
remove the tool.
2. Stop the carrier engine. Operate boom and hammer controls to release pressure
trapped inside hoses. Wait ten minutes for oil pressure to drop.
3. Close hammer inlet and outlet lines. If quick couplers are used, disconnection
automatically closes hammer lines. If hammer line includes ball valves, please
make sure that they are closed.
4. Disconnect hoses.
NOTICE! Protect environment from oil spills
. Plug the
hoses and the hammer inlet and outlet ports to keep dirt out from hydraulic
circuit.
5. Remove bucket pins and other parts.
Summary of Contents for 1533E
Page 3: ...Operation Page 3 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 1533E STD OPERATION ...
Page 40: ...COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY Page 40 Operation Operation 1533E STD ...
Page 41: ...Lubrication Page 41 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 1533E STD LUBRICATION ...
Page 53: ...Maintenance Page 53 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 1533E STD MAINTENANCE ...
Page 73: ...Page 73 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY ...