Operation - Page 25
COPYRIGHT © 2020 SANDVIK MINING AND CONSTRUCTION OY
Operation
1533E STD
5. OPERATION
5.1 OPERATING INSTRUCTIONS
RECOMMENDED USE
The hammer is designed to be used in breaking concrete, road surface or asphalt,
hard or frozen ground. It can be also used in breaking moderate sized boulders as
well as in demolishing reinforced structures and for major excavation and clearing
work. Your local dealer will gladly give you more information.
OPERATING CONDITIONS
Principle of installation
Almost all carriers meeting mechanical and hydraulic requirements can be used to
operate the attachment. See “Hammer specifications” on page 66. The product is
installed on the carrier much in the same manner as installing a bucket or other
attachments. A flange mounted attachment requires a separate mounting bracket.
If the carrier has already auxiliary hydraulic circuit, the installation requires only
suitable hoses and fittings. If the carrier does not have suitable kit to run the
attachment, one must be built. This may require installation including new piping
and additional valves such as directional valve and pressure relief valve.
Suitable kits can be ordered from the local dealers, from carrier manufacturers and
their dealers or from third party suppliers.
Hydraulic oil
In general the hydraulic oil originally intended for the carrier can be used with this
product. See “Requirements for hydraulic oil” on page 48.
Operating temperature
The operating temperature is -20 °C (-4 °F) to 80 °C (176 °F). If the temperature is
lower than -20 °C (-4 °F), the hammer and tool have to be preheated before any
operations can begin, in order to avoid breaking the accumulator's membrane and
the tool. During operation they will remain warm.
Note: The temperature of the hydraulic oil must be monitored. Ensure that oil grade
and monitored oil temperature together guarantee correct oil viscosity. See “Oil
specifications” on page 49.
Summary of Contents for 1533E
Page 3: ...Operation Page 3 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 1533E STD OPERATION ...
Page 40: ...COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY Page 40 Operation Operation 1533E STD ...
Page 41: ...Lubrication Page 41 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 1533E STD LUBRICATION ...
Page 53: ...Maintenance Page 53 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY 1533E STD MAINTENANCE ...
Page 73: ...Page 73 COPYRIGHT 2020 SANDVIK MINING AND CONSTRUCTION OY ...