INSTALLATION MANUAL
Visio 160/45 F - Visio 160/45/32 3S - Visio 160/45/32 LC - Visio 160/45/32 RC
Gas type
(Natural gas - LNG)
G20
I2H, I2E
G20/G25
I2E+
G25/G25.3
I2L / I2EK
I2(43.46 -45.3 MJ/
m3 (0°C))
G20/G25
I2ELL
Supply Pressure
mbar
20
20 / 25
25
20
Nominal Heat Input
Gross (Hs)
kW
23.5
23.5 / 21.5
21.5
19.5
Nominal Heat Input
Net (Hi)
kW
21.1
21.1 / 19.2
19.3
17.5
Consumption
m³/hr
2.2
2.2 / 2.35
2.36
2.2
Burner Pressure
(hot)
mbar
14
14 / 19
19
14
Injector Marking
360 Centre, 2 x 360 Left, 2 x 360 Right
Pilot
G30-ZP2-312 (31.2 inj)
Efficiency Class
1
NOx Class
5
Type
C11 / C31
Gas type
(Town gas)
G150.1
Supply Pressure
mbar
8
Nominal Heat Input
Gross (Hs)
kW
20.5
Nominal Heat Input
Net (Hi)
kW
18.4
Consumption
m³/hr
3.600
Burner Pressure
(hot)
mbar
3.5
Injector Marking
1200 x 1 + 1400 x 4
Pilot
G150.1 CG (inj. 27.1 - 90)
Efficiency Class
1
NOx Class
5
Type
C11 / C31
64 - GB
GB
Summary of Contents for VISIO 4 Series
Page 14: ...INSTALLATION MANUAL 5 Position the bottom grate above the burner 14 GB GB ...
Page 24: ...INSTALLATION MANUAL INSTALLATION MANUAL 1000 1000 150 1000 50 Tunnel models 24 GB GB ...
Page 70: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE 70 GB GB ...
Page 71: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE GB 71 GB ...
Page 72: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE 72 GB GB ...
Page 73: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE GB 73 GB ...
Page 74: ...INSTALLATION MANUAL DECLARATION OF PERFORMANCE 74 GB GB ...
Page 75: ...INSTALLATION MANUAL DECLARATION OF CONFORMITY GB 75 GB ...
Page 76: ...INSTALLATION MANUAL DECLARATION OF CONFORMITY 76 GB GB ...
Page 99: ...INSTALLATION MANUAL Flue parts GB 99 GB ...
Page 100: ...INSTALLATION MANUAL 100 GB GB ...
Page 101: ...INSTALLATION MANUAL GB 101 GB ...
Page 102: ...INSTALLATION MANUAL 102 GB GB ...
Page 108: ...INSTALLATION MANUAL 108 GB GB ...