
Continued on next page:
*NOTE: Tube Slide will need to be installed on Pod B prior to Billy Goat Bridge installation.
Refer to instructions on pages 94, 96, and 98 to install Tube Slide.
1. Position Design B pod and Design C pod
111 1/8"
apart on a level surface.
*NOTE: Main Beams (7144) must be level when connecting Pod B to Pod C.
*NOTE: 9/16" dia. holes must be centered (approximately 1 11/16") on Uprights (6792) (6803)
(6794) (6802).
2. Position Main Beams
(7144)
(with countersunk holes facing in) directly on top of top deck of Pod B
and match drill through Uprights
(6794) (6802)
(and slide panel) using a
9/16" diameter drill bit.
3. Attach Main Beams
(7144)
to Uprights
(6792) (6802)
using 3/4" Hardware
(H5)
and 1/2" Hardware
(H4) (H12) (H18) (H29) (H71) (H72)
. Do not fully tighten hardware.
*NOTE: Use 1/2" Hardware (H72) where Main Beam (7144) attaches to Upright (6802) and Slide
Panel (N253).
4. Measure up
60
11/16"
on Uprights
(6792) (6803)
and drill a 9/16" diameter hole, centered, through
Uprights.
5. Attach Main Beams
(7144)
to Uprights
(6792) (6803)
using 3/4" Hardware
(H5)
and 1/2" Hardware
(H4) (H12) (H18) (H29) (H71)
. Do not fully tighten hardware.
6. Attach Billy Goat Bridge Uprights
(6788)
to Main Beams
(7144)
using 3/4" Hardware
(H5)
and 1/2"
Hardware
(H4) (H12) (H18) (H29) (H71)
.
*NOTE: 10 Hole Facia (4843) should be level when installed properly.
*NOTE: 10 Hole Facia (4843) should flush up directly underneath 8 Hole Facia (4845) when
properly installed.
7. Measure up
44 3/4"
from the bottom of Billy Goat Bridge Uprights
(6788)
and attach 10 Hole Facia
(4843)
to Uprights
(6794) (6802) (903) (6803)
and Billy Goat Bridge Uprights using 3/8" Hardware
(H3) (H116)
.
8. Square and level Billy Goat Bridge and finish tightening all thru bolt hardware.
9. Attach Slims
(6001) (6002)
to BGB Main Beams
(7144)
and Uprights
(6792) (6803)
(as shown) using
3/8" Hardware
(H3) (H116)
.
*NOTE: No gaps should exist between mating surfaces of Slims (6001) (6002), BGB Main
Beams (7144), and Uprights (6792) (6803).
10. Refer to Step 19 on pages 63-64 to install Billy Goat Bridge Decks.
11. Refer to Step 20 on pages 65-66 to install 5 Hole Facias
(3944)
.
12. Refer to Step 51 on page 106 to install Rails.
13. Refer to Steps 37 & 46 on pages 92 & 101 to install Extended Bubble.
14. On Pod 2 side, attach Entrapment Board
(4696)
to ends of BGB Main Beams
(7144)
using
1/4" Hardware
(H1) (H97)
.
83
Step 29
Billy Goat Bridge
Installation