
Continued on next page:
1. Position Deck Panels
(A133)
between BGB Uprights
(6788)
and attach to BGB Main Beams
(7144)
using 1/4" Hardware
(H1) (H99)
.
2. On each side of Deck Panels
(A133)
, attach Filler Boards
(3356)
to BGB Main Beams
(7144)
using
1/4" Hardware
(H1) (H97)
.
3. Attach Entrapment Boards
(4696)
to ends of Billy Goat Main Beams
(7144)
(when leaving Design 1
pod as shown in Inset B) and to Main Beam
(7690)
(when entering Design 2 pod as shown in Inset A)
using 1/4" Hardware
(H1) (H97)
.
4. Attach Slims
(6001) (6002)
to BGB Main Beams
(7144)
and Uprights
(6789) (6802)
(as shown) using
3/8" Hardware
(H3) (H116)
.
*NOTE: Slims (6001) (6002), BGB Main Beams (7144), and Uprights (6789) (6802) should not
have gaps between mating surfaces.
63
Step 19
Billy Goat Bridge
Installation