
Continued on next page:
1. Center and attach Deck Runner
(4730)
to bottoms of Deck Panels
(A117)
using 1/4" Hardware
(H1)
(H93)
.
2. Position 4 Hole Facia
(4693)
flush with the top of other 4 Hole Facia
(4693)
and attach using 3/8"
Hardware
(H3) (H116)
.
3. Position the Commercial Opening Upright
(6675)
flush with the end of 4 Hole Facia
(4693)
, on top of
Deck Panels
(A117)
,
and attach using 3/8" Hardware
(H3) (H116) (H119)
(as shown).
59
Step 17
Center Posts, Fillers, &
Deck Runner Installation