18
www.raider.bg
3.2. Installation of guide bars and saw chain.
Prior to guide bar installation remove plastic transport spacer, placed on guide fixing screws under the guard. Use pin
and adjustment screw for adjustment of chain tension. It is very important that the bolt located on adjustment screw falls into
hole in the guide bar during installation of the guide bar.
You can move the bolt to the front and back by turning the adjustment screw. Those parts must be set appropriately prior
to starting guide bar installation in the saw.
Guide bar and chain are supplied separately.
Brake lever (6) must be in the upper (vertical) position.
Unscrew the guide bar fixing nuts (7) and remove the casing (10).
Put the chain (21) onto driving chain wheel located behind the clutch.
Install the guide bar (20) (slide it behind the clutch) onto guiding screws and push towards driving chain wheel.
Put the chain (21) onto guide bar chain wheel (22) from below.
Move the guide bar (20) away from the driving chain wheel, so chain guiding links are placed in the guide bar groove.
Ensure the pin of the chain tension adjustment screw is in the middle of the lower hole of the guide bar (20), adjust when
necessary.
Place the casing (10) in its place and fix by slightly tightening guide bar fixing nuts (7).
Strain the chain appropriately using the chain tension adjustment screw (8). Chain tension is appropriate when the chain
can be lifted by 3 to 4 mm in the middle of the guide bar in horizontal position.
Firmly tighten guide bar fixing screws (7) while holding the guide bar tip.
Prior to guide bar and chain installation ensure that position of chain cutting blades is appropriate (correct position of the
chain on the guide bar is shown on the tip of the guide bar). Always wear protective gloves during checks and installation of
the chain to prevent cuts from sharp edges of the chain.
New chain requires start-up period, which lasts approximately 5 minutes. Chain lubrication is very important in this phase.
Check chain tension after start-up period and readjust if necessary.
Check and adjust the chain tension frequently. Too loose chain can easily slide off the guide bar, quickly wear out or
quickly wear out the guide bar.
3.3. Filling saw tank with oil.
Oil tank in new chain saw is empty. Fill the tank with oil prior to first use.
Unscrew oil filler plug (18).
Pour in maximally 260 ml of oil (be careful to avoid contamination of oil during filling of the tank).
Screw oil filler plug (18).
Do not use oil that has been already used or regenerated, as this may damage the oil pump. Use SAE 10W/30 oil for the
whole year or SAE 30W/40 in summer and SAE 20W/30 in winter.
3.4. Filling the fuel tank.
When filling the fuel, follow these rules:
Engine must not work.
You must not spill the fuel.
Accordingly to the below table, mix petrol (lead-free with octane number 95) with good quality engine oil for two stroke
engines.
Recommended fuel blend ratio.
Working conditions Petrol: oil
Working conditions Petrol: oil 25 : 1
1 L gasoline - 40ml two strocke oil
Unscrew fuel filler plug (15). Pour in previously prepared fuel blend (max. 550 ml). Screw fuel filler plug (15).
Most problems with combustion engines result directly or indirectly from fuel used. You must not use oil designed for
Summary of Contents for RDP-GCS21
Page 2: ...2 www raider bg 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 3 8 16 15 14 13 1 2 4 5 6 12 9 7 10 11...
Page 9: ...9 4 6 4 7 6 20 0 12 s 4 8 1 2 6 6 12 4 9 7 21 20 8 3 4 mm 7 4 10...
Page 10: ...10 www raider bg 1 11 11 4 11 4 12 4 13...
Page 11: ...11 45 B 2 1 3 4 2 5...
Page 12: ...12 www raider bg 4 14 19 12 19 12 4 15 1 3 4 16 4 17 5 5 1...
Page 13: ...13 5 2 5 4 3 4 4 4 5 3 5 4 5 14 7 10 20 21 20 22 21 5 5 5 6 15 15 5 7 18...
Page 14: ...14 www raider bg 18 5 8 4 0 65 mm 5 9 RAIDER...
Page 39: ...39 1 7 1 7 1 1 7 2 1 7 3 1 7 4 2 3 3 1 3 2 k 6 7 10 21 20 21 22 k 20 20 10 7 8 3 4 mm 7...
Page 41: ...41 9 20 MIN MAX 9 MAX 9 MIN 15 40 260 ml 4 4 4 5 20 4 6 4 7 6 20 0 12 s 4 8 1 2 6 6 12...
Page 42: ...42 www raider bg 4 9 7 21 20 8 3 4 mm 7 4 10 1 11 11 4 11 4 12...
Page 43: ...43 4 13 45 B 2 1 3 4...
Page 44: ...44 www raider bg 2 5 4 14 19 12 19 12 4 15 1 3 4 16 4 17...
Page 45: ...45 5 5 1 5 2 5 4 3 4 4 4 5 3 5 4 5 14 OFF 7 10 20 21 20 22...
Page 46: ...46 www raider bg 21 5 5 5 6 15 15 5 7 18 18 5 8 4 0 65 mm 5 9 RAIDER...
Page 57: ...57 Upozorenje Opasnost Za titite se od udarca vrsto dr ite testeru sa obe ruke tokom upotrebe...
Page 64: ...64 www raider bg 1 11 11 4 11 4 12 4 13 45...
Page 66: ...66 www raider bg 4 16 1 3 4 17 5 5 1 5 2 5 4 3 4 4 4 5 3 5 4...
Page 83: ...83 4 6 4 7 6 20 0 12 4 8 1 2 6 6 12 4 9 7 21 20 8 3 4 7 4 10...
Page 84: ...84 www raider bg 1 11 11 4 11 4 12 4 13 45...
Page 85: ...85 B 2 5 4 14 19 12 19 12 4 15 1 3...
Page 86: ...86 www raider bg 4 16 1 3 4 17 5 5 1 5 2 5 4 3 4 4 4 5 3 5 4 5 14 7 10 20 21 20 22...
Page 87: ...87 21 5 5 5 6 15 15 5 7 18 18 5 8 4 0 65 5 9 RAIDER...
Page 138: ...138 www raider bg EXPLODED VIEW RDP GCS21...
Page 139: ...139 SPARE PART LIST...
Page 145: ...145 1 5 2 bar Raider 18 Raider Industrial Raider Pro 12 Raider Power Tools Raider Garden Tools...
Page 146: ...146 112 115 112 1 2 1 2 3 113 1 2 3 2 114 4 5 114 1 113 1 2 2 3 115 4 115 1 2 1 3 1 1...
Page 147: ...246 0700 44 155 e mail info euromasterbg com...
Page 154: ...154 www raider bg...