NOTE:
- Switching on the control board by the General Switch, Product Code and Firmware Version are
displayed for 2 seconds.
Display Discription
Display
Discription
Product Code
Program Version
8.2 Operation start of boiler on biomass
•
Boiler connected to Hydraulic system.
•
Ensure that the probe is set to automatic flue
(figure.12)
Figure 12. Placing the probe
•
Check whether the mechanism for transport of pellet is firmly supported onto the floor,
that the flap of the fan is maximum opened and the flap guide for safety air is from 15 to
20 mm.
(Figure.13 i 14)
Summary of Contents for BIOmax Series
Page 18: ...5 Šema vezivanja automatike ...
Page 21: ...7 Hidraulična šema ...
Page 54: ...5 Schematic connection of automation ...
Page 57: ...7 Hydraulic scheme ...
Page 74: ......