slika 13. Položaj klapne ventilatora slika 14. Položaj max. otvorene klapne vent.
•
Power outlet on the back boiler connected to the main power network.
•
Infuse a small amount of pellets in the silos and close it.
•
At this stage it is necessary to insert the pellets into the combustion chamber by means of
the work of the transport mechanism for the pellet (pellet feeding system). In this way we
achieve a continuously distributed pellet from the combustion chamber to the silo. The
initiation of mechanism for pellet can be achieved only at the stage when on the display it
says 'OFF'. Then press the command button 2, which in its lower part has a symbol of the
screw conveyor, and the mechanism starts up. As long as we are holding the button
pressed the mechanism is in operation. When we release the button the mechanism stops.
Loading the pellet into the chamber , by the-so-called manual command is to be
performed a little lower, up to the starting position of the parts of grey cast iron, as
shown in
figure15
.
Figure15. Level display pellets
•
Now that we have the pellets in the combustion chamber and when they are in the
zone of the heater for initiation of fire , we can start the operation of the boiler. Start is
Summary of Contents for BIOmax Series
Page 18: ...5 Šema vezivanja automatike ...
Page 21: ...7 Hidraulična šema ...
Page 54: ...5 Schematic connection of automation ...
Page 57: ...7 Hydraulic scheme ...
Page 74: ......