Product Features
Intelligent Electric Vehicle Chargepoints
QUBEVSM-V01-R0 Installation and Operation Manual
Page
5
of
42
February 2023
the chargepoint software to reduce the power it draws when it is needed by higher priorities in the
area and will increase power when those priorities reduce.
If the chargepoint is used with a DSR agreement in place, peak and off-peak charging will not be
implemented because the power company’s systems will control the charging process.
About PEN Protection
The PEN protection system removes the need to install a dedicated earth for the chargepoint
although an earth is still required via the power cable.
In the event of a fault, the system will break all power cable connections between the chargepoint
and the vehicle.