Installation
Intelligent Electric Vehicle Chargepoints
QUBEVSM-V01-R0 Installation and Operation Manual
Page
11
of
42
February 2023
7. If required, make sure there is an ethernet cable connection available at the installation
site.
8. If required, make sure wireless communications signal strength is available at the
installation site.
x
Wireless communications need to be strong and stable.
x
If using Wi-Fi from the property a booster and/or outdoor antenna may be required on
the property to provide sufficient signal strength.
9. Determine the output power of the charger paying consideration to the incoming power
supply and any other factors that may limit the power available for charging.
x
Output power can be adjusted by setting the DIP switches as instructed during
charger installation.
10. Determine the rating of the property main fuse/circuit breaker. This will be needed to set
up load balancing.
IMPORTANT:
Write the fuse rating in the space provided on
the rear cover of this manual.
11. Determine whether the charger will be controlled by the ‘Application and OCPP’ or to only
to OCPP.
x
The type of connection can be adjusted by setting the DIP switches as instructed
during charger installation.
12. Make sure the unit model is correct and matches the order.
13. Make sure the unit and any accessories do not appear to have been damaged in transit.
14. Make sure the supplied fixings are suitable for the mounting location. If not, alternatives
must be obtained before proceeding with the installation.
NOTE
: This product does not contain its own electrical protective device or a physical
energy meter. If required, these devices must be installed externally.
15. Make sure any additional electrical protective devices (such as an MCB, RCD or RCBO)
required by regional legislation, have been correctly installed to the power supply.
16. If an independent form of energy monitoring is required, a meter should be installed to the
power cable that feeds the charge point. Similarly, if solar power is used, a meter may also
be installed to the power cable feeding the charge point from the solar supply.