Installation
Intelligent Electric Vehicle Chargepoints
QUBEVSM-V01-R0 Installation and Operation Manual
Page
15
of
42
February 2023
Installation Procedure
NOTE:
All electrical work must be performed in accordance with the applicable Electrical Wiring
Regulations for the region of use.
NOTE:
If load balancing will be enabled on this charge point it should, ideally, be installed
alongside the ‘standard installation’.
CAUTION: Equipment Damage
During the next steps, the charger front panel will be removed. Take care to not damage or
strain cables or cable connections that may pass between the enclosure and the front panel.
1. Remove the QUBEV Smart from the packaging.
2. Release the fixings that secure the front panel to the rear enclosure.
3. Carefully lift the front panel away from the rear enclosure to access to the interior.
CAUTION: Equipment Damage (Socket Versions)
The front panel is connected to the charger by electrical cables. Take care not to damage,
strain, or disconnect the cables. At the end of the procedure, make sure all connections are
secure before refitting the panel.
4. Visually inspect the QUBEV Smart and internal components.
x
Any components that may have come away from the DIN rail in transit must be
refitted to the rail if there is no damage to the component or its securing
mechanism.
IMPORTANT
: Items damaged in transit must first be reported to the courier and then
to the supplier.
x
Where possible, photographic evidence of package and/or unit damage
should be provided.
x
Incorrect or damaged units must NOT be installed. Contact your supplier to
discuss rectification.
5. Make note of the location of the incoming power terminals within the enclosure. This will
help when positioning the unit to match the customer’s needs.
6. Remove the mounting bracket from the packaging or, if already mounted to the charger,
remove the 4x securing bolts from the bracket then removed the bracket from the charger.
x
The securing bolts will be required when the charger is mounted back onto the
bracket.
NOTE:
If the charger will be post mounted, secure the mounting bracket to the plate on the
mounting post using the fasteners provided then move to step 11.
7. Use the mounting bracket to mark the mounting positions.
x
Place the mounting bracket onto the mounting location (wall).
x
Make sure the bracket is flat against the wall and is orientated correctly and is level.
x
Mark the 4 fixing holes onto the surface of the wall.
x
If the power supply cable, CT cable, ethernet cable, etc. will be coming through the
wall, mark the appropriate cable aperture(s).