I
NSTALLATION
AND
A
SSEMBLY
S
AFETY
I
NSTRUCTIONS
G
UIDELINES
8-3
The system is designed to operate in a typical office environment.
Choose a site that is:
Clean and free of airborne particles (other than normal room dust).
Well ventilated and away from sources of heat including direct sunlight.
Away from sources of vibration or physical shock.
Isolated from strong electromagnetic fields produced by electrical devices.
In regions that are susceptible to electrical storms, we recommend you plug your system into a surge
suppressor and disconnect telecommunication lines to your modem during an electrical storm.
Provided with a properly grounded wall outlet.
Provided with sufficient space to access the power supply cord(s), because they serve as the product's
main power disconnect.
WARNING!
The server system is safety certified as rack-mounted equipment for use in a server room or computer room, using the customer
rack kit.
The rail racks are designed to carry only the weight of the server system. Do not place additional load onto any rail-mounted
equipment.
System rack kits are intended to be installed in a rack by trained service technicians.
Summary of Contents for STRATOS S200 Series S200-X12TS
Page 24: ...About the Server Chapter 1 ...
Page 50: ...Installing Hardware Chapter 2 ...
Page 95: ...BIOS Chapter 3 ...
Page 150: ...BMC Chapter 4 ...
Page 215: ...Connectors and Jumpers Chapter 5 ...
Page 218: ...Rail Kit Assembly Chapter 6 ...
Page 222: ...Troubleshooting Chapter 7 ...
Page 228: ...Installation and Assembly Safety Instructions Chapter 8 ...
Page 232: ...Safety Information Chapter 9 ...
Page 241: ...Regulatory and Compliance Infor mation Chapter 10 ...