
Q24
Tape
Library
Installation
and
Operations
Manual
© Copyright QUALSTAR 2014
85
Figure
67
Re
‐
installing
Shipping
Lock
4.
To store or ship the removed base chassis, repackage it in its original packaging materials,
see
Section
6.
5.11
Replacing
the
base
chassis
1.
Remove the base chassis from the rack, as described above.
2.
To install the new base chassis and its components, see
Section
2.