Model Q4P07
Installation, Operation and Maintenance
14
Rev. 12/26/2013
Q4P07-IOM-Q.doc
O
PTIONAL
A
CCESSORIES
O
IL
D
RIP
T
RAY
(Q4P09DT)
1) Place drip tray between runways in the Jack
rail,
Fig 24
.
2) Slide along jack rail until its in desired location.
Fig 24 – Oil Drip Tray
S
TORAGE
P
LATFORM
(Q4P09SP)
1) Up to four Storage Platforms can be placed
between the runways,
Fig 25
.
Fig 25 – Storage Platform
J
ACK
P
LATFORM
(Q4P09JT)
1) The Jack Platform rest on the jack rails
between the runways. It can be positioned as
needed along the rail,
Fig 26
.
Fig 26 – Jack Platform
M
OBILITY
K
IT
(Q4P09CS)
1) This set of four casters when attached to the
cross beams of an unloaded lift,
Fig 27
, pick
the lift up and allow it to be rolled to a different
location.
Fig 27 – Mobility Kit
H
AND
O
PERATED
R
OLLING
J
ACK
(QRJ03H)
1) Move the jack into under vehicle and extend
the arms to the pick up points.
2) Make sure the lowering valve is closed all the
way by turning the knob clockwise,
Fig 28
.
3) Raise vehicle desired height, rest the jack in
one of the jack locks.
4) To lower, pump the jack to raise it enough to
disengage the lock, and turn the lowering knob
counter-clockwise.
Fig 28 – Rolling Jack
E
XTENDED
A
LUMINUM
R
AMPS
(Q4P09ER)
1) Install in the runway by placing the two studs in
the slotted holes.
2) Remove before raising the lift.