NOTE: Level bubble should not only be between
the lines, the bubble should be centered between
the lines. If shims do not allow sufficient centering
of the bubble, it is best to lean the rear columns in
the direction toward each other and the front
columns in the direction toward each other.
30) Install the four cable ends with one load lock
nut, and one jam nut.
Power Unit
31) Install the Power Unit to the column using the
supplied M8x20mm bolts and M8 nuts. The
power unit can be installed on either the front
or side of the power column to suit install
location, shown in
Fig 15
.
Fig 15 – Power Unit
32) For installs on the front of the column
(Fig
16)
, rout the power unit supply line to the
bulkhead shown below. Attach the 90
degree fitting at a slight angle downward and
secure the hose to the fitting.
Fig 16 – Supply Line, Front
33) Remove the 3/8-18 NPT plug on the side of
the power unit and attach the 90 degree
elbow at a slightly downward angle. Secure
the hose to the bulkhead shown in
Fig 17
.
Fig 17 – Return Line, Front
34) For installs with the power unit on the side of
the column route the supply line to the
bulkhead shown in
Fig 18
.
Fig 18 – Supply Line, Side
35) Remove the 3/8-18 NPT plug on the side of
the power unit and attach the 90 degree
elbow,
Fig 19
.
Fig 19 – Return Line, Side
NOTE: When attaching the return line to the
bulk head in the runway, make sure it is
securely attached at the power unit, and the
hose is not twisted or kinked into a position