background image

Model Q4P07 

Installation, Operation and Maintenance

 

Rev. 12/26/2013 

Q4P07-IOM-Q.doc

 

WARNING

V

ERTICAL 

C

LEARANCE

 

Check the height of the area where the lift is to be 
installed. Clearance should be calculated based on 
the full raised height of the lift. 

Failure by purchaser to 
provide adequate clearance 
could result in unsatisfactory 

lift performance, property damage, or personal 
injury. 

F

LOORING

 

Be certain you have the proper concrete floor to 
properly handle the loaded lift.  Floor should be in 
generally good condition with no large cracks, 
spalling or deterioration.  

Minimum requirements for concrete are 4 inches 
minimum depth, with steel reinforcement, 3500 
psi, cured for 28 days per local commercial 
practice

.  This lift is designed to accommodate a 3 

inch total variation in elevation at the base of the 
four posts.  Floor should be level within 1/2 inch 
from side-to-side and 2 1/2 front-to-rear to avoid 
special shimming.  No anchors should be installed 
within 8 inches of any crack, edge, or expansion 
joint. If these conditions cannot be met, a pad may 
be poured to accommodate the lift.  

A qualified person should be consulted to address 
seismic loads and other local or state requirements. 

Failure by purchaser to 
provide the recommended 
mounting surface could 

result in unsatisfactory lift performance, 
property damage, or personal injury. 

L

OCATION

 

This lift has been evaluated for indoor use only with 
an operating ambient temp. range of 5 – 40°C  
(41-104°F)

 

E

LECTRICAL 

R

EQUIREMENTS

 

For lift installation and operation with standard 
power unit, it is necessary to have a dedicated 115V 
single-phase 60-cycle circuit with a 20 amp circuit 
breaker or time delay fuse. 

For lift installation and operation with 230V power 
unit, refer to 

Fig 24

 

 

S

AFETY 

N

OTICES AND 

D

ECALS

 

For your safety, and the safety of others, read and 
understand all of the safety notices and decals 
included here. 

R

EAD ENTIRE MANUAL BEFORE ASSEMBLING

,

 

INSTALLING

,

 OPERATING

,

 OR SERVICING THIS 

EQUIPMENT

P

ROPER MAINTENANCE AND INSPECTION IS 

NECESSARY FOR SAFE OPERATION

DO

 

NOT

 OPERATE A DAMAGED LIFT

.

 

Safety decals similar to those shown here are found 
on a properly installed lift. Be sure that all safety 
decals have been correctly installed on the Power 
Unit reservoir. Verify that all authorized operators 
know the location of these decals and fully 
understand their meaning. Replace worn, faded, or 
damaged decals promptly. 

Do not attempt to raise a 
vehicle on the lift until the 
lift has been correctly 

installed and adjusted as described in this 
manual.  

 

 

 
 

WARNING

WARNING

Summary of Contents for Q4P07

Page 1: ...d Lift Models Q4P07 7 000 lb Capacity 200 Cabel Street P O Box 3972 Louisville Kentucky 40201 3972 Email sales qualitylifts com Web site www qualitylifts com Office 877 771 5438 502 583 5438 Fax 502 5...

Page 2: ...ht of Runway Top at Top Lock Position allow 2 3 8 of clearance above top vehicle for lock release 68 1 8 Clear Height Underneath Runway top lock position 63 J Length Base Plate to Base Plate 165 13 9...

Page 3: ...Model Q4P07 Installation Operation and Maintenance 3 Rev 12 26 2013 Q4P07 IOM Q doc Fig 2 Drive Under Height On Locks...

Page 4: ...ocal or state requirements Failure by purchaser to provide the recommended mounting surface could result in unsatisfactory lift performance property damage or personal injury LOCATION This lift has be...

Page 5: ...nent Packing List ITEM QTY LIFT DESCRIPTION 1 1 IDLER RUNWAY ASS Y 2 1 POWER RUNWAY ASS Y 3 1 POWER COLUMN ASS Y 4 3 IDLER COLUMN ASS Y 5 2 ENTRANCE RAMP 6 2 CROSS BEAM ASS Y 7 1 POWER UNIT 8 2 FRONT...

Page 6: ...the cross beams on the runway per Fig 5 below Place cardboard between the runway and cross beam Slide the column over the ends of the slide blocks on the cross beam Repeat for each column 7 With help...

Page 7: ...M 13 At the rear of the power runway continue routing cables 3 4 to the front of the power runway sheaves Fig 9 14 At the front of the power runway continue routing cable 3 around the sheave and out t...

Page 8: ...e adjusted Fig 14 Lock Ladder Assembly Fig 11 Cable Jam Nut 22 Secure the cables to the top of the column with the nut and jam nut provided Fig 11 23 Repeat for the remaining three columns ANCHORING O...

Page 9: ...Power Unit 32 For installs on the front of the column Fig 16 rout the power unit supply line to the bulkhead shown below Attach the 90 degree fitting at a slight angle downward and secure the hose to...

Page 10: ...40 Raise lift to working height and lower lift onto locks Attach the mechanical lock bar to both cross beams using the hairpin cotter pins make sure the lock bar is positioned onto the saddle hook ins...

Page 11: ...13 Q4P07 IOM Q doc 49 Complete the Installation Checklist Warranty Validation questionnaire with the owner Review the terms of the warranty registration card and return the card and a copy for the que...

Page 12: ...pection and Maintenance and the employer shall insure that the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish proce...

Page 13: ...nt to fully lower the lift to release hydraulic pressure on the system LOSS OF POWER If for any reason the lift will not raise off the locks or the locks will not retract consult factory authorized pe...

Page 14: ...form MOBILITY KIT Q4P09CS 1 This set of four casters when attached to the cross beams of an unloaded lift Fig 27 pick the lift up and allow it to be rolled to a different location Fig 27 Mobility Kit...

Page 15: ...IMPORTANT Replace all worn damaged or broken parts with parts approved by Challenger Lifts Inc or with parts meeting Challenger Lifts Inc specifications Contact your local Challenger Lifts Parts Distr...

Page 16: ...Model Q4P07 Installation Operation and Maintenance 16 Rev 12 26 2013 Q4P07 IOM Q doc Parts Breakdown Fig A General Layout...

Page 17: ...1 STRAIGHT HYD FITTING 15 TCS3 5 03 00 1 HYDRAULIC CYLINDER ASSEMBLY 16 JSZ5 5 10 06 2 M14x1 5 BULKHEAD NUT 17 JSZ5 5 10 05 2 M14 BULKHEAD FITTING 18 B40082 1 CLEVIS PIN 19 B40126 1 1 8 x 1 Lg COTTER...

Page 18: ...ER SIDE FRONT CABLE Cable 1 103 1 8 34 TCS3 5 01 03 00 4 LOCK LADDER 35 MR6 005 4 M20 NUT 36 Q4P09 004 4 M20 LOCK NUT 37 VS10 40 17 8 M12 x 35mm Lg HEX FLG HD CAP SCREW 38 X10 038 8 M12 WASHER 39 X10...

Page 19: ...IN ASSEMBLY RUNWAY 48 B31188 4 M8 x 16mm Lg HEX LOCKING FLG HD CAP SCREW 49 TCS3 5 07 03 2 RUNWAY SHEAVE SPACER TALL 50 TCS3 5 07 02 2 RUNWAY SHEAVE SPACER SHORT Replace all worn damaged or broken par...

Page 20: ...Model Q4P07 Installation Operation and Maintenance 20 Rev 12 26 2013 Q4P07 IOM Q doc PARTS BREAKDOWN continued Fig D Cross Beams...

Page 21: ...G 71 TCS3 5 10 00A 1 LOCK ROD BAR 72 TCS3 5 04 10 00A 2 MECHANICAL LOCK COUPLER 73 GJY12 3 1 HAIRPIN COTTER PIN 74 TCS3 5 04 04 00A 1 MECHANICAL LOCK RELEASE HANDLE 75 TCS3 5 05 04 1 LOCK COUPLER PIVO...

Page 22: ...________ ZIP ___________ CUSTOMER INFORMATION COMPANY NAME _______________________________________________ CONTACT _____________________________________________________ PHONE NUMBER __________________...

Reviews: