background image

Model Q4P07 

Installation, Operation and Maintenance

 

Rev. 12/26/2013 

Q4P07-IOM-Q.doc

 

Receiving

 

The shipment should be thoroughly inspected as 
soon as it is received. The signed bill of lading is 
acknowledgement by the carrier of receipt in good 
condition of shipment covered by our invoice. 

If any of the goods called for on this bill of lading are 
shorted or damaged, do not accept them until the 
carrier makes a notation on the freight bill of the 
shorted or damaged goods. Do this for your own 
protection. 

NOTIFY 

Quality Lifts

 AT ONCE if any hidden loss 

or damage is discovered after receipt. 

IT IS DIFFICULT TO COLLECT FOR LOSS OR 
DAMAGE AFTER YOU HAVE GIVEN THE 
CARRIER A CLEAR RECEIPT. 

File your claim with 

Quality Lifts 

promptly. Support 

your claim with copies of the bill of lading, freight bill, 
and photographs, if available. 

Fig 3 – 

Package Components 

  

A

CCEPTED 

O

ILS 

 

Do not use oils with detergents

 

Hydraulic fluid is not provided with the lift shipment 

-10

 

wt. 

anti-foam, anti-rust hydraulic / biodegradable oil

 

-Dexron III ATF 

Component Packing List 

ITEM 

QTY/ 

LIFT 

DESCRIPTION 

IDLER RUNWAY ASS’Y 

2 1 

POWER 

RUNWAY 

ASS’Y 

3 1 

POWER 

COLUMN 

ASS’Y 

IDLER COLUMN ASS’Y 

5 2 

ENTRANCE 

RAMP 

 

CROSS BEAM ASS’Y 

7 1 

POWER 

UNIT 

FRONT WHEEL STOP 

REAR WHEEL STOP 

10 

MECHANICAL LOCK BAR 

11 8 

SHIPPING 

HARDWARE 

12 

SHIPPING BRACKET WELD 

I

NSTALLATION

 

I

MPORTANT

:

 

Always wear safety glasses while installing lift. 

T

OOLS 

(

MINIMUM REQUIRED

a.  Tape measure, 25ft 
b. Chalk 

line 

c. 4ft 

level 

d.  10”  & 12” adjustable wrench 
e.  Standard open end wrenches  
f. 6mm 

allen 

wrench 

g. Box 

knife 

h.  Thread locking compound 
i. Needle 

nose 

pliers 

j.  Hammer drill with 3/4” diameter carbide tipped 

bits 

(Optional)

 

k. 2lb 

hammer 

l.  Torque wrench: 150 foot pounds minimum with 

1 1/8” socket 

(Optional)

 

m.  8 ft. Step ladder 
n.  Blocking – (4) 4x4x30”, (4) 1x4x12” 
o.  Transit for leveling alignment lift 

L

AYOUT

 

1) Lay out the service bay according to the 

architect’s plans or owners instructions 

(see Fig 

1

). Be certain that the proper conditions exist, 

see pages 2 & 3. 

2)  Unpack lift. Remove all packaging from Power 

Runway (power runway has four cable sheaves 
at rear end) and pull threaded cable ends out. 
Make sure the cables are in the proper sheaves 
at the 4-stack, 

Fig 6

3)  Remove the mechanical lock bar from the Idler 

Runway. 

 
 
 
 

Summary of Contents for Q4P07

Page 1: ...d Lift Models Q4P07 7 000 lb Capacity 200 Cabel Street P O Box 3972 Louisville Kentucky 40201 3972 Email sales qualitylifts com Web site www qualitylifts com Office 877 771 5438 502 583 5438 Fax 502 5...

Page 2: ...ht of Runway Top at Top Lock Position allow 2 3 8 of clearance above top vehicle for lock release 68 1 8 Clear Height Underneath Runway top lock position 63 J Length Base Plate to Base Plate 165 13 9...

Page 3: ...Model Q4P07 Installation Operation and Maintenance 3 Rev 12 26 2013 Q4P07 IOM Q doc Fig 2 Drive Under Height On Locks...

Page 4: ...ocal or state requirements Failure by purchaser to provide the recommended mounting surface could result in unsatisfactory lift performance property damage or personal injury LOCATION This lift has be...

Page 5: ...nent Packing List ITEM QTY LIFT DESCRIPTION 1 1 IDLER RUNWAY ASS Y 2 1 POWER RUNWAY ASS Y 3 1 POWER COLUMN ASS Y 4 3 IDLER COLUMN ASS Y 5 2 ENTRANCE RAMP 6 2 CROSS BEAM ASS Y 7 1 POWER UNIT 8 2 FRONT...

Page 6: ...the cross beams on the runway per Fig 5 below Place cardboard between the runway and cross beam Slide the column over the ends of the slide blocks on the cross beam Repeat for each column 7 With help...

Page 7: ...M 13 At the rear of the power runway continue routing cables 3 4 to the front of the power runway sheaves Fig 9 14 At the front of the power runway continue routing cable 3 around the sheave and out t...

Page 8: ...e adjusted Fig 14 Lock Ladder Assembly Fig 11 Cable Jam Nut 22 Secure the cables to the top of the column with the nut and jam nut provided Fig 11 23 Repeat for the remaining three columns ANCHORING O...

Page 9: ...Power Unit 32 For installs on the front of the column Fig 16 rout the power unit supply line to the bulkhead shown below Attach the 90 degree fitting at a slight angle downward and secure the hose to...

Page 10: ...40 Raise lift to working height and lower lift onto locks Attach the mechanical lock bar to both cross beams using the hairpin cotter pins make sure the lock bar is positioned onto the saddle hook ins...

Page 11: ...13 Q4P07 IOM Q doc 49 Complete the Installation Checklist Warranty Validation questionnaire with the owner Review the terms of the warranty registration card and return the card and a copy for the que...

Page 12: ...pection and Maintenance and the employer shall insure that the lift inspectors are qualified and that they are adequately trained in the inspection of the lift The Owner Employer shall establish proce...

Page 13: ...nt to fully lower the lift to release hydraulic pressure on the system LOSS OF POWER If for any reason the lift will not raise off the locks or the locks will not retract consult factory authorized pe...

Page 14: ...form MOBILITY KIT Q4P09CS 1 This set of four casters when attached to the cross beams of an unloaded lift Fig 27 pick the lift up and allow it to be rolled to a different location Fig 27 Mobility Kit...

Page 15: ...IMPORTANT Replace all worn damaged or broken parts with parts approved by Challenger Lifts Inc or with parts meeting Challenger Lifts Inc specifications Contact your local Challenger Lifts Parts Distr...

Page 16: ...Model Q4P07 Installation Operation and Maintenance 16 Rev 12 26 2013 Q4P07 IOM Q doc Parts Breakdown Fig A General Layout...

Page 17: ...1 STRAIGHT HYD FITTING 15 TCS3 5 03 00 1 HYDRAULIC CYLINDER ASSEMBLY 16 JSZ5 5 10 06 2 M14x1 5 BULKHEAD NUT 17 JSZ5 5 10 05 2 M14 BULKHEAD FITTING 18 B40082 1 CLEVIS PIN 19 B40126 1 1 8 x 1 Lg COTTER...

Page 18: ...ER SIDE FRONT CABLE Cable 1 103 1 8 34 TCS3 5 01 03 00 4 LOCK LADDER 35 MR6 005 4 M20 NUT 36 Q4P09 004 4 M20 LOCK NUT 37 VS10 40 17 8 M12 x 35mm Lg HEX FLG HD CAP SCREW 38 X10 038 8 M12 WASHER 39 X10...

Page 19: ...IN ASSEMBLY RUNWAY 48 B31188 4 M8 x 16mm Lg HEX LOCKING FLG HD CAP SCREW 49 TCS3 5 07 03 2 RUNWAY SHEAVE SPACER TALL 50 TCS3 5 07 02 2 RUNWAY SHEAVE SPACER SHORT Replace all worn damaged or broken par...

Page 20: ...Model Q4P07 Installation Operation and Maintenance 20 Rev 12 26 2013 Q4P07 IOM Q doc PARTS BREAKDOWN continued Fig D Cross Beams...

Page 21: ...G 71 TCS3 5 10 00A 1 LOCK ROD BAR 72 TCS3 5 04 10 00A 2 MECHANICAL LOCK COUPLER 73 GJY12 3 1 HAIRPIN COTTER PIN 74 TCS3 5 04 04 00A 1 MECHANICAL LOCK RELEASE HANDLE 75 TCS3 5 05 04 1 LOCK COUPLER PIVO...

Page 22: ...________ ZIP ___________ CUSTOMER INFORMATION COMPANY NAME _______________________________________________ CONTACT _____________________________________________________ PHONE NUMBER __________________...

Reviews: