qcconveyors.com
| Assembly —
Fixing Side Rail Using Screw
| 11
Fixing Side Rail Using Screw
ASSEMBLY
CARET-LEFT
Drill two holes near the
beginning of each slide rail
section. Use the drill fixture to ensure
clean-cut holes and correct location
of holes. The holes must be at the
beginning edge of the joint piece, in
the direction of travel, to hold slide
rail in place when conveyor is in use.
Use a well-sharpened drill bit.
1
Use a countersink to
deburr and countersink
the holes. Also make sure no metal
filings are left underneath the
slide rail.
2
Insert screws in the holes,
using screw bit and hand
drill to tighten the screws.
3
Check that screws do not
protrude over surface
of slide rail. Check both top and
bottom surface of slide rail for
protruding metal.
4
Keep a distance of
approximately 30mm
between rivets and idler unit in
case the idler end must be removed
after conveyor system assembly.
5
Applicable for ML2 and MX2 only
MS2 SR 25 Side Rail Shown
comment-alt-exclamation