Figure 3: Rear view
1
3
4
5
6
2
1: RS232 connection for up/downloading to the InSite software.
2: The location of the control panel backup battery.
3: The power connection for a GPRS modem.
4: The connection for an I/O board if connected.
5: The connection for the modem installed.
6: The power connection (+12V DC) for the Enforcer.
Setting Up
It is recommended that the Engineer Menu is accessed prior to opening a powered
Enforcer.
Before you install a new panel peripheral, such as a modem, I/O board, or expander, power
off the Enforcer (mains and battery).
14
Enforcer Installation Guide
102017854 - V01
Summary of Contents for Enforcer 64
Page 1: ...102017854 V01 Software V12 0 Enforcer 64 Installation Guide...
Page 85: ...Notes Enforcer Installation Guide 102017854 V01 85...
Page 86: ......
Page 87: ......
Page 88: ......