![Protecto F-SAFE SST-P 11/6 F30 Installation And Operating Manual Download Page 57](http://html.mh-extra.com/html/protecto/f-safe-sst-p-11-6-f30/f-safe-sst-p-11-6-f30_installation-and-operating-manual_1619902057.webp)
ENGLISH
Protectoplus Lager- und Umwelttechnik GmbH
, Tel. +49 4331/4516-0, Fax +49 4331/4516-11
Internet:
www.protecto.de
, E-mail:
- 57 -
12.5.2.
Installation procedure
•
The position of the cable / pipe bulkhead (on our products) should be
determined on site, taking the dimensions of the doubler plate into account
•
Drill a Ø 135 mm hole with a core drill (see Figure 1)
•
The doubler plates can be used as a marking template
Fig. 1
•
Smooth the drilled hole with sandpaper (CAUTION: The edges are sharp)
•
Mark and drill Ø 3.5 x 35 mm pilot holes on site for fixing the doubler plates
(see Figure 2)
Fig. 2
•
Position the doubler plates exactly over the Ø 135 mm hole, then fasten
them using the enclosed countersunk head screws after drilling the pilot
holes in the wall
•
The fixing holes in the doubler plate are offset, so that one plate can be
screwed to another if the plates are turned 180°