Configuration/Installation Sequence
ProSoft Technology, Inc.
Page 17 of 101
January 8, 2018
3
Configuration/Installation Sequence
3.1
Configuration
1.
Download and install latest Wireless I/O Designer Software.
2.
Check for latest Wireless Gateway Firmware on Download Center.
3.
Create a Project File Using Wireless I/O Designer.
4.
If upgrading Firmware, follow these instructions
a. Physically Connect Gateway to PC and supply power
b.
Open Connect screen and click “Flash”
c.
Locate new Firmware file and click “Open”
d. DO NOT DISCONNECT OR TURN POWER OFF while upgrading
Firmware (It may take a few minutes for upgrading process to finish)
e. Wait until LED turns off
5.
Install WIO Gateway on DIN rail using supplied DataRail.
6.
Attach desired I/O Modules to system (Modbus Slave ID).
7.
Power up Gateway (9-30 VDC) and wait until boot-up sequence is complete.
(LED will turn off once boot-up is complete)
8.
Connect PC to Gateway.
9.
USB to Mini USB Cable 15 ft (WX-1001-CA2).
10.
Identify COM Port for use in Wireless I/O Designer (Device Manager).
11.
Select a Gateway in Project Tree.
12.
Update Gateway with Project File.
13.
Confirm Gateway Configuration Download OK in Build Tab Window.
Summary of Contents for BM GM1K Series
Page 1: ...Multipoint Wireless I O System January 8 2018 USER MANUAL...
Page 2: ......
Page 4: ...Wireless I O System User Manual Page 4 of 101 ProSoft Technology Inc January 8 2018...
Page 8: ......
Page 14: ...Product System Overview Page 14 of 101 ProSoft Technology Inc January 8 2018...
Page 27: ...Wiring Examples ProSoft Technology Inc Page 27 of 101 January 8 2018...
Page 28: ...Page 28 of 101 ProSoft Technology Inc January 8 2018...
Page 36: ...Page 36 of 101 ProSoft Technology Inc January 8 2018...
Page 90: ...Troubleshooting Page 90 of 101 ProSoft Technology Inc January 8 2018...
Page 92: ...Page 92 of 101 ProSoft Technology Inc January 8 2018...
Page 98: ...Page 98 of 101 ProSoft Technology Inc January 8 2018...