
7.2 Installation, hydraulic
CAUTION!
Warning of escaping feed chemical
Feed chemical can escape in the event
that the hose lines are incorrectly
installed.
–
Only use original hoses with the
specified hose dimensions.
–
Avoid reducing the hose sizes.
Direction of flow
The flow direction through the device
goes from the bottom to the top.
Hydraulic dampers
Install hydraulic dampers, such as
accumulators, inline dampers or
bladder accumulators / diaphragm
accumulators downstream of the
DFMa.
A zero flow must be available.
Installing the hosing:
1.
Cut off the ends of the hoses (6) so that
they are straight.
2.
Unscrew the union nut (5) and push
over the hose together with the clamp
ring (4).
3.
Push the hose end (6) up to the stop
over the nozzle (3).
4.
Tighten the union nut (5).
5.
Pull on the hose (6) and tighten up the
union nut (5).
1
3
2
4
5
6
P_MAZ_0041_SW
Fig. 3: Installing the hose line
1
Connector
2
Seal
3
Nozzle
4
Clamp ring
5
Union nut
6
Hose
Assembly and Installation
16