Introduction...
1
Important Safety Instructions…
2-7
General Overview…
8
General Operation…
9-12
Approved Lithium Batteries...
12
CZone...
13
Installation...
14-16
Typical Wiring…
17-29
Charging your Batteries...
30
Maintenance...
31
Troubleshooting...
32
Warranty Information...
33
Important Charger Operation Note:
Once your new ProTournament
elite is installed and properly connected to batteries you will be
ready to plug it in.
Please note the ProTournament
elite has a built-in self test feature that will also analyze all battery
connections and batteries to determine if your boat’s batteries are capable of being charged
correctly. The self test is automatic and will take place every time the unit is plugged into an
AC outlet. The self test takes approximately 1 minute to complete.
During the self test, the analyze mode LED indicated will pulse. When completed if everything
is connected properly and the batteries are above 2.5 volts DC then the charger will register
and illuminate the green system check indicator followed by a solid (non-flashing) red charge
mode LED indicating all batteries are charging.
If the charger does not go into the charge mode with a solid red charge mode indicator and
the System Check indicator is not illuminated with a solid green LED then a red battery bank
fault LED will illuminate identifying the battery(s) that have either a wiring fault present i.e.
poor connection, a blown DC cable fuse, the DC cable is wired in reverse polarity, battery
cable is wired across multiple batteries in series, or the battery itself may be under 2.5 volts
DC. In any of these cases, refer to the troubleshooting section on page 32 of this manual.
Table of Contents
Table of Contents