2. INSTALLATION AND DEBUGGING
2.1 ENSURE INSTALLATION SPACE
When installing the machine, ensure adequate installation space (reserve at least 500mm
around the machine), as shown in the figure below. Installation in a narrow space is not
conducive to the operation of the machine and machine inspection and maintenance, do not sit
on the machine or put things.
Do not rotate flammable and explosive materials around the machine.
2.2 PIPING INSTATLLATIONS
1) Connect the machine to the mold with Teflon hose, and use wrench to tight the inlet/ outlet
joints to avoid any possible leakage. (Reference drawing
)
2) Connect the cooling water inlet to water supply, and connect the cooling water outlet to
the water drain area.
Note: the inlet and outlet of cooling water are shown in the figure below. Do not connect them in
reverse
!
When the service temperature is above 100 ° C, the high temperature resistant pipe
must be used for the cooling water pipe
.