e-mail: [email protected]
W
6385 MONTESSOURI STREET
LAS VEGAS, NEVADA 89113-1186
TOLL FREE: 800-258-8877
Order Fax: 800-223-8305
PPE
3
)
Install in reverse order.
4.4 HEATER
1) Open the heating cover (as shown in the picture, first press the black switch downward
and then open the heating cover outwards)
2) Remove the heating tube cover (as shown in the figure, unscrew the screws, loosen the
wire clamp and remove the heating tube cover).
3
)
After cleaning the electric heat pipes, installs the electric heat pipes back into the
machine in reverse order
Solenoid valve
24