25
BLK
BLK
WHT
WHT
GRN
GND
INSIDE UTILITY BOX,
CONNECT AS SHOWN
INCOMING
POWER
115V - 1Ø
OPERATOR
UTILITY BOX
1. Be sure power switches at source and operator are
OFF.
2. Connect incoming power lines and ground wire as
shown below.
Hot leg (black) to BLACK; Neutral (white) to
White: Ground to GREEN
26
INSTALLATION OPTIONS
LEFT/RIGHT HAND CONVERSION:
Determine the hand of the operator required for this
installation by checking the direction the gate moves in order
to open, when viewed from inside the fence. Slides
RIGHT
to open is a right hand installation, slides
Left
to open is a
left hand installation.
RIGHT HAND
PUBLIC AREA
OR STREET
LEFT HAND
PUBLIC AREA
OR STREET
NOTE:
This unit is
factory setup for
RIGHT
HAND
operation.
To
convert operator to left
hand operation move
dipswitch #2 to “ON”
position.
1 2 3 4 5
ON
OFF
1 2 3 4 5
ON
OFF
Place Dipswitch #2
In "ON" Position For Left
Hand Operation And
"OFF" Position For Right
Hand Operation.
Left Hand
Operation
Right Hand
Operation
CO
M
CO
M
CO
M
24
V
AC
24
V
AC
AL
T
RDO OP
N
CRO
FR
E
OP
N
CL
O
ST
O
CO
M
CO
M
CO
M
OP
N
PH
O
CL
O
PH
O
SH
W
RE
V
OP
N
ED
G
CL
O
ED
G
MS
T
OP
N
MS
T
CL
O
CO
M
CO
M
CO
M
OPEN
PUSH
FREE
EXT
ALT
RADIO
OPN/
CLO
RADIO
OPEN
CLOSE
PUSH
STOP
PUSH
CLOSE
PHOTO
OPEN
PHOTO
LD18
LD10
LD11
LD12
LD15
LD14
LD16
LD17
LD13
OPEN
CLOSE
STOP
OPEN
CLOSE
FORCE
ADJUSTMENT
AUTO
RECLOSE
TIMER
OFF MAX
MID
LIMIT
REV
LOOP
OPN
EDGE
CLO
EDGE
RH OPN
LH CLO
LIMIT
RH CLO
LH OPN
LIMIT
MOTOR
OPEN
MOTOR
CLOSE
SHADOW
LOOP
LD19
LD2
LD3
LD4
LD5
LD6
LD8
LD9
LD7
1 2 3 4 5
POWER
LD1
P3
P4
TB1
TB2
U1
U2
U4