V1.01
20
Ground (yellow green)
L Line (brown or black)
N Neutral
(blue)
5. Make sure the wires are connected properly.
PAY ATTENTION:
Important
Make sure to connect the mains cables with the correct polarity. Connecting L and N
wires in reverse can cause a short circuit in the utility company when these inverters
are used in parallel.
PAY ATTENTION:
Devices such as air conditioners need at least 2~3 minutes to restart,
because it should have enough time to balance refrigerant gas in circuits. If a power
shortage occurs and recovers in a short time, it will cause damage to your connected
devices. To avoid this kind of damage, check with the manufacturer of the air conditioner
if it is equipped with an installation delay function. Otherwise, this inverter/charger will
cause overload error and turn off the output to protect your device, but sometimes it still
causes internal damage to the air conditioner.
PV connection
PAY ATTENTION:
Before connecting to PV modules, please install a DC switch between inverter and PV
modules separately.
warning!
All wiring must be done by qualified personnel.
warning!
It is very important for system safety and efficient operation to use correct cable for PV
module connection.
To reduce the risk of injury, use the correct recommended cable size as below
.
MODEL
AMPERAGE
CABLE THICKNESS
COUPLE
PB.UPS.2K24
60A
8AWG
1,4
–
1,6Nm
PB.UPS.3K24
60A
8AWG
1,4
–
1,6Nm
PB.UPS.5K48
80A
6AWG
2,0
–
2,4Nm
Summary of Contents for LfeLi-48100TB
Page 10: ...V1 01 10...
Page 11: ...V1 01 11 PB UPS 2K24 PB UPS 3K24 PB UPS 5K48...
Page 12: ...V1 01 12...
Page 62: ...V1 01 62...
Page 63: ...V1 01 63 PB SC12 170...
Page 64: ...V1 01 64...
Page 81: ...V1 01 81 PB Li 12 100D...
Page 82: ...V1 01 82...
Page 100: ...V1 01 100...
Page 101: ...V1 01 101 LfeLi 48100TB...
Page 102: ...V1 01 102...
Page 105: ...V1 01 105 Product structure LFeLi frontpanel...
Page 137: ...V1 01 137 APPENDIX...
Page 138: ...V1 01 138...
Page 139: ...V1 01 139 COMPOSITION AND SETTINGS SYSTEMS PB UPS 2 2 24...
Page 141: ...V1 01 141 PB LSC 1 PB SC12 170 PB UPS 2K24...
Page 142: ...V1 01 142...
Page 143: ...V1 01 143 PB UPS 3 5 24...
Page 145: ...V1 01 145 PB LSC 1 dimensions in mm PB SC12 170 dimensions in mm...
Page 146: ...V1 01 146 PB UPS 3K24 dimensions in mm...
Page 147: ...V1 01 147 PB UPS 5 5 48...
Page 149: ...V1 01 149 PB LSC 1 dimensions in mm PB SC12 170 dimensions in mm...
Page 150: ...V1 01 150 PB UPS 5K48 dimensions in mm...
Page 151: ...V1 01 151 PB UPS 10 10 48...
Page 153: ...V1 01 153...
Page 154: ...V1 01 154 PB LSC 2 dimensions in mm B SC12 170 dimensions in mm...
Page 155: ...V1 01 155 PB UPS 5K48 dimensions in mm...
Page 156: ...V1 01 156 PB UPS 15 15 48...
Page 158: ...V1 01 158...
Page 159: ...V1 01 159 PB LSC 2 dimensions in mm B SC12 170 dimensions in mm...
Page 160: ...V1 01 160 PB UPS 5K48 dimensions in mm...
Page 161: ...V1 01 161 PB UPS 2 2 24 Li...
Page 163: ...V1 01 163 PB LSC 1 PB Li 12 100D...
Page 164: ...V1 01 164 PB UPS 2K24...
Page 165: ...V1 01 165 PB UPS 3 5 24 Li...
Page 167: ...V1 01 167 PB LSC 1 PB Li 12 100D...
Page 168: ...V1 01 168 PB UPS 2K24...
Page 169: ...V1 01 169 PB UPS 5 5 48 Li...
Page 171: ...V1 01 171 LfeLi48100T dimensions in mm PB LSC Li dimensions in mm...
Page 172: ...V1 01 172 PB UPS 5K48 dimensions in mm...
Page 173: ...V1 01 173 PB UPS 10 10 48 Li...
Page 175: ...V1 01 175 LfeLi48100T dimensions in mm PB LSC Li dimensions in mm...
Page 176: ...V1 01 176 PB UPS 5K48 dimensions in mm...
Page 177: ...V1 01 177 PB UPS 15 15 48 Li...
Page 179: ...V1 01 179 LfeLi48100T dimensions in mm PB LSC Li dimensions in mm...
Page 180: ...V1 01 180 PB UPS 5K48 dimensions in mm...
Page 183: ...V1 01 183 ANL MEGA...
Page 190: ...V1 01 190...
Page 191: ...V1 01 191...
Page 192: ...V1 01 192...