11
Step 2:
With one person on each side, carefully lift the cabinet out of the
outer carton using the handles on the cardboard and set it on a flat,
stable surface (see Figure 3-3&3-4).
Place the cabinet in a protected area that has adequate airflow and
is free of humidity, flammable gas, and corrosion.
Lifting the Cabinet:
Figure 3-3: Lifting the Cabinet out of 6K UPS carton
CAUTION:
The cabinet is heavy. Lifting the cabinet out of the carton required
two persons at least.
Summary of Contents for VFI 10000P/RT LCD
Page 4: ......
Page 31: ...27 Figure 4 5 a Parallel systerm wiring diagram of 6K 10K ...
Page 32: ...28 Figure 4 5 b Parallel System Installation Diagram ...
Page 43: ...39 Figure 5 14 Main menu tree ...
Page 50: ...46 Example set rated output voltage value Figure 5 20 Set rated output voltage value ...