14
3.5 Rack mount Setup
CAUTION:
The cabinet is heavy, so:
1) Remove the battery tray from the UPS before lifting.
2) Lifting the cabinets into the rack requires a minimum of two
people.
CAUTION: Removing the batteries requiered precautions, which
should be performed or supervised by personnel with knowledge of
batteries . Keep unauthorized personnel away from batteries.
CAUTION: If installing an EBM(Extended Battery Module), install
the EBM directly below the UPS.
3.5.1 Install the UPS and EBM (Extended Battery Modules) in
a rack:
1. Open the front panel and put it above the UPS.
Figure 3-8. Open the front panel (left: 6K Model, right: 10K Model)
2. Remove the battery protection plate:
Figure 3-9. Removing the Battery Protection Plate
Summary of Contents for VFI 10000P/RT LCD
Page 4: ......
Page 31: ...27 Figure 4 5 a Parallel systerm wiring diagram of 6K 10K ...
Page 32: ...28 Figure 4 5 b Parallel System Installation Diagram ...
Page 43: ...39 Figure 5 14 Main menu tree ...
Page 50: ...46 Example set rated output voltage value Figure 5 20 Set rated output voltage value ...