3. Installation
This chapter explains:
Equipment inspection
Unpacking the cabinet
Checking the Accessory
UPS setup and installation
Connecting the internal battery
Connecting the EBM(Extended Battery Modules)
Installation requirements
3.1 Inspecting the Equipment
If any equipment has been damaged during shipment, keep the
shipping cartons and packing materials for the carrier or place of
purchase and file a claim for shipping damage. If you discover
damage after acceptance, file a claim for concealed damage.
Note: Check the battery recharge date on the shipping carton label.
If the date has passed and the batteries were never recharged, do
not use the UPS. Contact your service representative.
3.2 Unpacking the carton
CAUTION: If the carton unpacks in a low-temperature of
environment it may cause condensation of moisture in or on the
cabinet of UPS. Do not install the UPS until the inside and outside of
the cabinet is absolutely dry to prevent hazard of electric shock.
CAUTION: The cabinet is heavy. Refer following instruction to
unpack and move the cabinet from packing carton.
Be careful when moving and opening the carton. The unpacking
steps are shown as below:
Summary of Contents for VFI 10000P/RT LCD
Page 4: ......
Page 31: ...27 Figure 4 5 a Parallel systerm wiring diagram of 6K 10K ...
Page 32: ...28 Figure 4 5 b Parallel System Installation Diagram ...
Page 43: ...39 Figure 5 14 Main menu tree ...
Page 50: ...46 Example set rated output voltage value Figure 5 20 Set rated output voltage value ...