Powered by Safety
®
14
Installation
PowlVac
®
Ground & Test Device 15kV (ConEd EI-4102)
IB-50022A
1) Electrical Ground and Test Device Inspection
a. Inspect the primary disconnecting
devices for proper lubrication,
damage, debris, and dirt. Ensure that
disconnecting devices are in alignment
and are not bent. If damage or dirt is
present see
Ch 6 Maintenance
,
A. I
NSPECTION
AND
C
LEANING
.
If the primary disconnecting devices are
damaged, make no attempt to repair them.
Contact Powell immediately for further
directions.
IMPORTANT
IMPORTANT
!
b. Inspect the switchgear compartment to
ensure that it is clean and clear of debris
that might interfere with ground and
test device travel.