COUPLING AND UNCOUPLING THE TRAILER
GB
- 12 -
537 / AN- U. ABKUPPELN 9500 GB
Safety Cable
(max. 25 km und max. 4 to zul. Ges Gew.)
- Safety cable (6) to be fitted
correctly to tractor's towing
coupler. (Safeguard against
breakage of trailer coupling
ring or detachment from
tractor.)
Abreißseil
(nur bei
Auflaufbremsanlage)
- Bei Anhänger mit
Auflaufvorrichtung das
Abreißseil (1) vom
Handbremshebel am
Traktor verknoten.
(Safeguard against
breakage of trailer
coupling ring or
detachment from
tractor.)
Drive shaft adaption
To shorten the drive shaft see supplement-B!
Hydraulic connection
- Connect hydraulic lines to tractor.
• See also chapter
"HYDRAULIC OPERATION",
"ELECTROHYDRAULIC OPERATION".
Putting into operation
• Before putting the tractor or implement into operation check
vehicle safety (lights, brake unit, protective covering …)!
• Pay attention to correct load distribution during operation!
Uncoupling and parking the trailer
• See also chapter
"SUPPORTING WHEEL", "BRAKE
UNIT", "DRAWBAR".
Important!
Before uncoupling the snap-lock coupler
1. Raise the pick-up.
2. Close shut-off valve on snap-lock coupler (position A).
3. Release pressure on tractor's control unit (ST) and uncouple.
Attention!
• Always park implement so that it is standing safety.
• Secure trailer against rolling away (locking brake, wedges).
Parking in the open
When parking for longer
periods in the open, clean
plunger rods and then coat
with grease.
Garaging for winter
- Thoroughly clean the machine before garaging for winter.
- Apply weather protection.
- Change or top-up gear oil.
- Protect uncoated parts against rusting.
- Grease all lubricating points according to lubrication chart.
FETT
TD49/93/2
A
E
TD31/90/21
ST