Insert a screwdriver into the terminal strip as shown and lever it open
Insert the connection cables into the terminal contacts and remove the
screwdriver
6.7
Filling the system
1. Fill the heating system using the boiler fill and drain valve (BFD valve)
of the EC five
2. Control the heating system for leaks
For more information, see
Fig.21
Opening the terminal strip contacts
RA-0000296
N
6 Installation
7703301 - 01 - 16072018
49