INSTALL THE GAS LINES 

A qualified plumber can install the delivery 
piping up to and including the DISS Shut-Off 
Valves by following the details below and 
illustrations in this brochure.   
 

Important:

 The flowmeter systems are designed 

and intended to be used with gas supply lines 
installed using NFPA 99 guidelines.  Medical 
grade dry Nitrogen should be used as a “forming 
gas” while soldering.  To prevent oxidation 
inside supply lines: 

(a)  Use type K or L, pre-cleaned, degreased, 

capped copper tubing ONLY. 

(b)  Use 3/8” O.D. for Nitrous Oxide, use 1/2” 

O.D. for Oxygen.  DO NOT CHANGE 
TUBING DIAMETERS!! 

(c) All copper to copper joints are to be 

made using a brazing alloy conforming to 
AWS Classification BcuP-5 (see AWS 
Std. A5.8).  Flux shall not be used. 

(d)  After connecting all gas lines, shut off the 

DISS shut-off valves and check the 
system for leaks with dry Nitrogen per 
NFPA 99, by performing a 150 PSI, 24 
hour piping integrity test (5 PSI drop 
allowed). 

 

Important:

  Prior to installation, turn OFF central 

gas supply system and close all tank valves in 
tank room.  DISS Shut-off valves should be in 
closed position throughout installation of 
flowmeter. 

The dental dealer is responsible for the final 
connections to the flowmeter, the details of 
flowmeter installation, checking for crossed-
lines, leak testing of connections to the 
flowmeter, and basic flowmeter operation. 

 

SWITCHING THE UNIVERSAL 
CONNECTORS 

Note:

 Installations that require the connectors 

on the bottom of the flowmeter will need the 
connectors removed prior to mounting into the 
cabinet or wall.  After mounting the flowmeter, 
the connectors will then be re-installed onto the 
flowmeter in the bottom position. 

1.  Verify that the Universal DISS connections 

for O

2

 and N

2

O are in the desired location on 

the flowmeter (back or bottom).   

2.  The Universal connections may be switched 

from back to bottom or bottom to back.    

Caution: Perform this procedure with the 
flowmeter placed on a clean surface and be 
careful to protect the exposed holes from 
any possible entering debris.   

3.  Remove the O

2

 plug (3/16” Allen Wrench) 

and the Universal connection.   Carefully 
place the plug and connection on the clean 
surface without allowing the sealing o’rings 
to touch anything. 

3.1. The o’rings are lightly lubricated with 

Dow Corning High Vacuum Grease. 

 

(This is the only approved lubricant.) 

 

Caution:  Do not add any other 
lubrication to the o’rings. 

 

 
 

 

 

Rear View of Flowmeter with 
Connectors in the Back Position 

Side View with 
Back Connectors 

Summary of Contents for 4065D

Page 1: ...DIGITAL MXR D Cabinet Mount Flowmeter Component Diagram and Installation Instructions MODEL 4065D FM 1062 Rev B 6 07...

Page 2: ...CSA C22 2 No 601 1 M90 Symbol Description Protective Earth Ground Class I Device Alternating Current Earth Ground Attention consult the accompanying documents Type B Equipment Distribution of Porter M...

Page 3: ...s 9 NFPA Codes 9 INTENDED USE Flowmeter for Analgesia Delivery System 9 INSTALL THE GAS LINES 10 SWITCHING THE UNIVERSAL CONNECTORS 10 CABINET WALL MOUNT INSTALLATION 11 FLOWMETER ACCESSORIES 13 CHECK...

Page 4: ...is to be wired per NEC and local electrical codes The branch circuit breaker is the main disconnect Porter recommends the following 15A UL circuit breaker two wire with ground TANK REGULATOR SPECIFICA...

Page 5: ...anual the safety protection provided by the equipment might be impaired The Porter Digital MXR D is designed to be used in normal environmental conditions 1 Indoor use 2 Altitude up to 8000 feet 2 438...

Page 6: ...904 or call 1 800 344 3555 WARNING New or modified installations properly connected gas pipelines are absolutely essential to patient safety The dealer or contractor should provide written documentati...

Page 7: ...nd alarms needed for the Vanguard test Then turn off both Oxygen tanks and leave both Nitrous Oxide tanks on For the Sentinel only one tank of each gas is on at a time Turn off the one open Oxygen tan...

Page 8: ...outlet station the Oxygen 1 2 inch pipe is incorrectly decreased down to the DISS 3 8 inch size reserved for Nitrous Oxide lines Oxygen is fed into the Nitrous Oxide lines At gas outlet station the c...

Page 9: ...Analgesia Delivery System This device is intended for patient adult and pediatric use by an attending physician or dentist properly trained in its use Porter Instrument recommends the user be thorough...

Page 10: ...ter The dental dealer is responsible for the final connections to the flowmeter the details of flowmeter installation checking for crossed lines leak testing of connections to the flowmeter and basic...

Page 11: ...ce a piece of tape over the rear power supply connector temporarily so dry wall dust does not enter the connector Wrenches required 7 8 for N2O connector 5 8 for O2 connector and 7 16 for mixed gas co...

Page 12: ...e O2 shut off valve and the N2O DISS hose blue to the N2O shut off valve 9 Run 20 feet mixed gas hose from flowmeter mixed gas outlet hose barb to hose barb of Remote Surface Mount or Through Wall Ada...

Page 13: ...ff position Confirm that the DISS Shut Off Valves are in the open position Pressurize the sedation gas supply lines with 50 PSI Observe any pressure decay after an overnight time period 5 PSI drop all...

Page 14: ...POWER SUPPLY SYSTEM ILLUSTRATION 14...

Page 15: ...GAS DISTRIBUTION SYSTEM ILLUSTRATION 15...

Page 16: ...w Knobs to full mechanical stops Installation Check for proper display STEP 1 N2O L M There is no Oxygen flowing There is no Nitrous flowing N2O and Total Flow valves are shut tightly Normal display c...

Reviews: