background image

16. Perform the Check for Crossed Lines, the 

Leak Test of the Flowmeter Installation, and 
the Flowmeter Function Testing.  Flowmeter 
installation is now complete. 

 

FLOWMETER ACCESSORIES 

AVS (Automatic Vacuum Switch) Installation 
to Remote Bag Tee Mount or Through Wall 
Adapter Assembly 

Screw AVS 5000 knurled seal nut down tight 
onto remote bag tee mount or wall adapter, 
making sure the rubber washer is inside seal 
nut. When tight, AVS should not rotate. Then 
screw bag tee seal nut onto AVS. Bag tee 
should not rotate. Refer to FM-809 for User 
Instructions for Assembly, Installation and 
Cleaning of Porter Scavenger Rubber Goods 
System. 

Rubber Goods and Bag Tee Storage 

Remote 

bag tee can be disconnected with rubber goods 
for storage by unscrewing the knurled seal nut of 
the bag tee from the remote surface mount or 
through wall adapter

 

CHECK FOR CROSSED LINES 

 (Refer to NFPA Gas and Vacuum Systems 
Code for Type II Systems)  (See 

cross+protection Warning 

in this brochure.)

 

Open both the O

2

 and N

2

O shut-off valves to 

allow gas flow to the flowmeter.  

Before using 

flowmeter, check for crossed lines by 
opening the O

2

 valve and making certain that 

only Oxygen flows through the flowmeter.  

  

 

LEAK TEST

 

the flowmeter installation for 

working pressure leaks.

  After all hose 

connections are tightened, turn the flow control 
knobs to the off position and the On / Standby 
(Off) switch to the Standby (Off) position. 

 

Confirm that the DISS Shut-Off Valves are in the 
open position.  Pressurize the sedation gas 
supply lines with 50 PSI.  Observe any pressure 
decay after an overnight time period.  (5 PSI 
drop allowed.) 

 

POWER SUPPLY INSTALLATION 

Refer to Power Supply Installation Illustration on 
the following page. 
 
 
 

 

FLOWMETER FUNCTION TESTING 

 

Perform final installation checks by function 
testing the flowmeter.  Refer to FM-1061 MXR-D 
Flowmeter Instructions and Safety 
Considerations MXR Models of Porter 
Conscious Sedation Flowmeters and Bag Tee.   

 

MAINTENANCE AND SERVICE 

 
Flowmeter Service 

It is advisable, on a two year cycle, to have the 
MXR Flowmeter factory checked and serviced. 
 

Use Scavenging 

Monitor for N

2

O in the operatory to insure that 

controls are effective in achieving low levels of 
ppm (parts per million) exposure.  Contact 

 

Porter for details on monitors and testing. 
 

Inspect and maintain

 the analgesia delivery 

system to prevent N

2

O leaks in all hoses, 

connections and fittings.  Repair all leaks 
immediately. 
 

YEARLY LEAK CHECK

 (or if connections to 

flowmeter are disconnected and then 
reconnected, such as after a flowmeter service 
at the factory or if the DISS / DISS hose is 
replaced):  Leak test the flowmeter system for 
working pressure leaks.  After all hose 
connections are tightened, turn the flow control 
knobs to the off position and the On / Standby 
(Off) switch to the STANDBY position.  Confirm 
that the DISS Shut-Off Valves are in the open 
position.  Pressurize the sedation gas supply 
lines with 50 PSI.  Observe any pressure decay 
after an overnight time period.  (5 PSI drop 
allowed.) 

 

13

Summary of Contents for 4065D

Page 1: ...DIGITAL MXR D Cabinet Mount Flowmeter Component Diagram and Installation Instructions MODEL 4065D FM 1062 Rev B 6 07...

Page 2: ...CSA C22 2 No 601 1 M90 Symbol Description Protective Earth Ground Class I Device Alternating Current Earth Ground Attention consult the accompanying documents Type B Equipment Distribution of Porter M...

Page 3: ...s 9 NFPA Codes 9 INTENDED USE Flowmeter for Analgesia Delivery System 9 INSTALL THE GAS LINES 10 SWITCHING THE UNIVERSAL CONNECTORS 10 CABINET WALL MOUNT INSTALLATION 11 FLOWMETER ACCESSORIES 13 CHECK...

Page 4: ...is to be wired per NEC and local electrical codes The branch circuit breaker is the main disconnect Porter recommends the following 15A UL circuit breaker two wire with ground TANK REGULATOR SPECIFICA...

Page 5: ...anual the safety protection provided by the equipment might be impaired The Porter Digital MXR D is designed to be used in normal environmental conditions 1 Indoor use 2 Altitude up to 8000 feet 2 438...

Page 6: ...904 or call 1 800 344 3555 WARNING New or modified installations properly connected gas pipelines are absolutely essential to patient safety The dealer or contractor should provide written documentati...

Page 7: ...nd alarms needed for the Vanguard test Then turn off both Oxygen tanks and leave both Nitrous Oxide tanks on For the Sentinel only one tank of each gas is on at a time Turn off the one open Oxygen tan...

Page 8: ...outlet station the Oxygen 1 2 inch pipe is incorrectly decreased down to the DISS 3 8 inch size reserved for Nitrous Oxide lines Oxygen is fed into the Nitrous Oxide lines At gas outlet station the c...

Page 9: ...Analgesia Delivery System This device is intended for patient adult and pediatric use by an attending physician or dentist properly trained in its use Porter Instrument recommends the user be thorough...

Page 10: ...ter The dental dealer is responsible for the final connections to the flowmeter the details of flowmeter installation checking for crossed lines leak testing of connections to the flowmeter and basic...

Page 11: ...ce a piece of tape over the rear power supply connector temporarily so dry wall dust does not enter the connector Wrenches required 7 8 for N2O connector 5 8 for O2 connector and 7 16 for mixed gas co...

Page 12: ...e O2 shut off valve and the N2O DISS hose blue to the N2O shut off valve 9 Run 20 feet mixed gas hose from flowmeter mixed gas outlet hose barb to hose barb of Remote Surface Mount or Through Wall Ada...

Page 13: ...ff position Confirm that the DISS Shut Off Valves are in the open position Pressurize the sedation gas supply lines with 50 PSI Observe any pressure decay after an overnight time period 5 PSI drop all...

Page 14: ...POWER SUPPLY SYSTEM ILLUSTRATION 14...

Page 15: ...GAS DISTRIBUTION SYSTEM ILLUSTRATION 15...

Page 16: ...w Knobs to full mechanical stops Installation Check for proper display STEP 1 N2O L M There is no Oxygen flowing There is no Nitrous flowing N2O and Total Flow valves are shut tightly Normal display c...

Reviews: