background image

Bottom Connections 

11

 

 

3.2. Switching the positions, gently hand-

tighten the plug and Universal 
connection into the flowmeter.  Do not 
force.  The o’ring will help to center the 
piece in the cavity and the threading 
should proceed easily.  Tighten all the 
way until the piece makes metal-to-
metal contact with the flowmeter 
surface.  Tighten firmly. 

3.3. Repeat the above steps for the N

2

O plug 

(3/16” Allen Wrench) and Universal 
connection. 

 
CABINET / WALL MOUNT INSTALLATION 

 

IMPORTANT: 

ƒ

  It is not recommended installing unit on an 

outside wall. 

ƒ

  When using the (bottom) connections, it will 

be necessary to remove the N

2

O, O

2

 and 

Mixed Gas Connectors before installing the 
meter into the mounting frame and cabinet. 
Once the meter is in place, replace the 
connectors. Refer to “Switching the 
Universal Connectors” in this manual. 

ƒ

  Wall Mount Installations: Requires rear 

access large enough to install fittings and 
gas connections. Do not remove red caps on 
connectors until unit is installed. Place a 
piece of tape over the rear power supply 
connector temporarily so dry wall dust does 
not enter the connector. 

 
Wrenches required:  7/8” for N

2

O connector, 5/8” 

for O

2

 connector and 7/16” for mixed gas 

connector.   

 

 

Cabinet Mount Installation: 

 

Bezel kit B-4988 may be used. This kit is 
optional and must be ordered separately. 

 

Wall Mount Installation:  

Installations must use bezel kit B-4988. 

 

1.  Determine desired location of flowmeter. Use 

cut-out dimensions below or template FM-
383 provided with the kit to cut opening in 
cabinet or mounting apparatus. 

Note:

  

Flowmeter location needs to accommodate 5 
feet DISS hose-to-shut-off valve distance, 
and 20 feet mixed gas hose-to-remote bag 
tee distance. 

 

2.  Install flowmeter mounting frame, if used, in 

opening with arrows facing up and fasten 
securely. (Mounting fasteners are not 
provided.) Use cut-out dimensions as a 
guide to drill holes for mounting screws. 

3.  Attach retaining spring to meter body using 

two (2) each screws.  Repeat for opposite 
side. 

4.  Determine desired location of the Universal 

DISS connections on the flowmeter for O

2

 

and N

2

O (back or bottom).  The meter is 

shipped from the factory with the connectors 
in the back position. 

 

Summary of Contents for 4065D

Page 1: ...DIGITAL MXR D Cabinet Mount Flowmeter Component Diagram and Installation Instructions MODEL 4065D FM 1062 Rev B 6 07...

Page 2: ...CSA C22 2 No 601 1 M90 Symbol Description Protective Earth Ground Class I Device Alternating Current Earth Ground Attention consult the accompanying documents Type B Equipment Distribution of Porter M...

Page 3: ...s 9 NFPA Codes 9 INTENDED USE Flowmeter for Analgesia Delivery System 9 INSTALL THE GAS LINES 10 SWITCHING THE UNIVERSAL CONNECTORS 10 CABINET WALL MOUNT INSTALLATION 11 FLOWMETER ACCESSORIES 13 CHECK...

Page 4: ...is to be wired per NEC and local electrical codes The branch circuit breaker is the main disconnect Porter recommends the following 15A UL circuit breaker two wire with ground TANK REGULATOR SPECIFICA...

Page 5: ...anual the safety protection provided by the equipment might be impaired The Porter Digital MXR D is designed to be used in normal environmental conditions 1 Indoor use 2 Altitude up to 8000 feet 2 438...

Page 6: ...904 or call 1 800 344 3555 WARNING New or modified installations properly connected gas pipelines are absolutely essential to patient safety The dealer or contractor should provide written documentati...

Page 7: ...nd alarms needed for the Vanguard test Then turn off both Oxygen tanks and leave both Nitrous Oxide tanks on For the Sentinel only one tank of each gas is on at a time Turn off the one open Oxygen tan...

Page 8: ...outlet station the Oxygen 1 2 inch pipe is incorrectly decreased down to the DISS 3 8 inch size reserved for Nitrous Oxide lines Oxygen is fed into the Nitrous Oxide lines At gas outlet station the c...

Page 9: ...Analgesia Delivery System This device is intended for patient adult and pediatric use by an attending physician or dentist properly trained in its use Porter Instrument recommends the user be thorough...

Page 10: ...ter The dental dealer is responsible for the final connections to the flowmeter the details of flowmeter installation checking for crossed lines leak testing of connections to the flowmeter and basic...

Page 11: ...ce a piece of tape over the rear power supply connector temporarily so dry wall dust does not enter the connector Wrenches required 7 8 for N2O connector 5 8 for O2 connector and 7 16 for mixed gas co...

Page 12: ...e O2 shut off valve and the N2O DISS hose blue to the N2O shut off valve 9 Run 20 feet mixed gas hose from flowmeter mixed gas outlet hose barb to hose barb of Remote Surface Mount or Through Wall Ada...

Page 13: ...ff position Confirm that the DISS Shut Off Valves are in the open position Pressurize the sedation gas supply lines with 50 PSI Observe any pressure decay after an overnight time period 5 PSI drop all...

Page 14: ...POWER SUPPLY SYSTEM ILLUSTRATION 14...

Page 15: ...GAS DISTRIBUTION SYSTEM ILLUSTRATION 15...

Page 16: ...w Knobs to full mechanical stops Installation Check for proper display STEP 1 N2O L M There is no Oxygen flowing There is no Nitrous flowing N2O and Total Flow valves are shut tightly Normal display c...

Reviews: