3.47
ENGINE
3
9923983 - 2012-2013 RZR 170 Service Manual
© Copyright 2012 Polaris Sales Inc.
Starter Drive Assembly
1.
Apply Starter Drive Grease (PN 2871460) to the drive
bushings in the cases.
2.
Slide the starter drive gear into position on the one-
way gear and install the shaft.
3.
Install stator housing and torque bolts to specification.
Flywheel Installation
Install flywheel key, flywheel and the flywheel spacer.
Proceed to “Stator Housing Installation” if the stator
assembly is already installed.
IMPORTANT: Flywheel spacer installation is critical
for proper clamp-load when applying torque to the
flywheel nut. Verify spacer is installed before
assembly of the stator housing to the crankcase.
Stator Installation
NOTE:
The stator, flywheel, and starter drive
components can be serviced with the engine in the
frame.
1.
Install the stator and pulse coil. Route the wires
appropriately to avoid contact with any moving parts.
Torque bolts to specification.
2.
Apply a small amount of Crankcase Sealant (PN
2871557) to the stator wire grommet and install into
the housing cavity.
Starter Drive Grease:
(PN 2871460)
= T
Stator Bolt:
7-8 ft-lbs (9-11 Nm)
Pulse Coil Bolt:
4-5 ft-lbs (5-7 Nm)