1
1.3 Using the Manual
This manual aims to provide users and operators with all the information they require to ensure
that they are able both to use the lift appropriately and are able to manage it as autonomously
and safely as possible.
Before performing any operations on the lift, users and operators must carefully read the instruc-
tions given in this publication.
In the event of doubt over the correct interpretation of the instructions, contact the PLS technical
department to obtain the required clarifications.
This manual is an integral part of the lift, it must be kept safely by the purchaser and made avail-
able for use by the operators.
The contents of this manual comply with the Directive 2007/47/EC and were drafted following
the guidelines given in UNI 10893:2000. They also comply with the requirements of UNI EN ISO
10535:2007 and BS EN 1789:2007 and A2:2014
Data and drawings are indicative only; with a view to the continuous development and updating
of its products, the manufacturer may modify the contents without notice.
It is prohibited to disclose, edit or use this manual for any other purposes.
This symbol indicates IMPORTANT Information used by the Manufacture and
the User
This symbol indicates areas that need routine maintenance
This symbol indicates Operators areas of responsibility
This symbol indicates that a potentially hazardous situation could occur
This symbol indicates improper use of the lift
This symbol indicates IMPORTANT areas for the Safe operation of the Lift
General
Summary of Contents for Access ACC-1150
Page 7: ...1 1 5 Heath Safety Scooters General ...
Page 23: ...7 7 7 Floor Height Adjustment Installation 7 INSTALLATION 7 6 Floor Height Adjustment ...
Page 25: ...7 7 9 Weight Test Installation 7 INSTALLATION 7 8 Weight Test Dynamic Dynamic ...
Page 30: ...Thread Size Tightening Torque Nm Hydraulic Fitting BSP 1 8 17 0 1 4 34 0 3 8 47 0 ...
Page 31: ...8 8 1 Standard Operating Procedure Operation 8 OPERATION 8 1 Standard Operating Procedure ...
Page 32: ...8 8 2 Manual Override Procedure Operation 8 OPERATION 8 2 Manual Override Procedure ...
Page 35: ...10 10 2 Loler Service Maintenance ...
Page 44: ...13 13 1 Wiring Diagram Power Pack Diagrams 13 DIAGRAMS 13 1 Wiring Diagram Power Pack ...
Page 46: ...13 13 3 Hydraulic Diagram Diagrams 13 DIAGRAMS 13 3 Hydraulic Diagram ...
Page 82: ...15 Notes ...
Page 83: ...15 Notes ...