6
6.1 Receipt and Inspection
Logistics
IF THE DELIVERED DEVICE DOES NOT COMPLY WITH THESE
REQUIREMENTS, NOTIFY THE MANUFACTURER IMMEDIATELY.
STORAGE OF THE LIFT IN CONDITIONS THAT DO NOT
COMPLY WITH THE ABOVE DESCRIPTION SHALL NULLIFY
THE WARRANTY FOR ANY PARTS TO BE REPLACED.
store
Note: If a lift is to be dry stored for more than 12 months then all cylinder seals MUST be
checked before operation
6
LOGISTICS
6.1 Receipt and Inspection
Upon delivery of the lift, you need to perform the following inspections:
- Ensure the product delivered corresponds to the relevant documentation e.g. the order
specification and the transport document.
- Examine packaging to ensure it is undamaged and all parts are intact during
transportation.
- With great care, examine all devices to ensure they haven’t been damaged during
transportation and all parts haven’t been tampered or removed.
- Ensure all documentation required for installation has been supplied.
6.2 Storing The Lift
If the lift is not used, proceed as follows:
-
Transport lift to an appropriate storage area, free from atmospheric agents /
elements.
-
Ensure all electrical / electronic devices are insulated from external environment so
to prevent humidity damaging those components.
-
Storage area selected MUST ensure temperature variation is between 5°C to 50°C
fresh hold.
-
Ensure all sliding parts (guides, cylinders ...) are adequately protected from dust,
rust and water damage.
-
Do not store for over 6 months. For longer periods of storage, before putting into
service contact the manufacture to have the lift conditions inspected.
6.2 Storing The Lift
Summary of Contents for Access ACC-1150
Page 7: ...1 1 5 Heath Safety Scooters General ...
Page 23: ...7 7 7 Floor Height Adjustment Installation 7 INSTALLATION 7 6 Floor Height Adjustment ...
Page 25: ...7 7 9 Weight Test Installation 7 INSTALLATION 7 8 Weight Test Dynamic Dynamic ...
Page 30: ...Thread Size Tightening Torque Nm Hydraulic Fitting BSP 1 8 17 0 1 4 34 0 3 8 47 0 ...
Page 31: ...8 8 1 Standard Operating Procedure Operation 8 OPERATION 8 1 Standard Operating Procedure ...
Page 32: ...8 8 2 Manual Override Procedure Operation 8 OPERATION 8 2 Manual Override Procedure ...
Page 35: ...10 10 2 Loler Service Maintenance ...
Page 44: ...13 13 1 Wiring Diagram Power Pack Diagrams 13 DIAGRAMS 13 1 Wiring Diagram Power Pack ...
Page 46: ...13 13 3 Hydraulic Diagram Diagrams 13 DIAGRAMS 13 3 Hydraulic Diagram ...
Page 82: ...15 Notes ...
Page 83: ...15 Notes ...