9)
Slide the bands up the pulleys on both ends and try to centre them on the pulleys
and on the sealing/cooling bars.
10)
Raise the rails by following the procedure in section 1.6
11)
Tension the bands by turning the tension knobs clockwise.
Do not over-tension.
Adjustment of the bands is critical—if the bands are too tight, they may break.
2.2
REPLACING TEFLON BANDS (MPS6140)
To replace the Teflon bands for the table-top model, follow these steps:
1)
It is necessary to follow the lockout procedure 1.1, and be aware of section 1.2 which
states the cooling times of the sealing bars before continuing.
FIGURE - 5
Pressure Plates
Cooling
Heating Bars