MPS6100-M OPERATION MANUAL
ORIGINAL INSTRUCTIONS
Page 7
2.0
UNPACKING AND ASSEMBLY
To reduce any risk of damage during shipping, the MPS 6100 series models are
securely packed in three separate sections that need to be assembled. The three sections are
the sealing section (consisting of the head and rails), the stand stem, and the stand base.
Tools Required
Number of Persons Needed
1. Philips Head Screwdriver
2. Adjustable Wrench
2
CAUTION: This assembly weighs in total over 28 kilograms, please use a minimum of two
people to remove this from the box and to mount in its final position.
2.1
UNCRATING THE MPS 6100 SERIES
1)
Open the box then remove the first layer of plastic wrap and foam to uncover the head
and rails. Carefully lift the head and rails out of the box and set aside.
2)
Remove the second layer of wrap and foam to uncover the two stand sections the base
and the stem. Remove each component separately and set aside.
2.2
ASSEMBLING THE MPS 6100 SERIES
1)
The stand must first be assembled. To do so, remove the four supplied screws that are
attached in the top section of the stand.
2)
Once the screws are removed, place the top of the stand into the base section as shown
in Figure #3.
3)
Replace the screws to attach the stem to the base, tightening firmly into place.