
41
Service Rail
Clean excessive grease off racking and inspect for damage/wear. If
necessary re-apply lubrication. We recommend that you lubricate
three teeth every 300mm on the rack.
Inspect rack jointing bolts and replace/re-fit if necessary.
Clean rail tubes and inspect for damage/wear.
Check combined end stops/charging ramps are fixed firmly and in the
correct position.
Inspect all sprung roll pins on rail joints and legs and replace/re-fit if
necessary.
Inspect all leg screws and replace/re-fit if necessary.
If wall brackets are fitted, inspect screws and bolts and replace/re-fit if
necessary.
Check charge circuit is operating correctly.
Check carriage stops in the correct position at the top and bottom.
Summary of Contents for Curve Stairlift
Page 33: ...33 Connection Diagram...
Page 34: ...34...
Page 42: ...42 Notes...
Page 43: ...43 Notes...