If you are working on the driven pulley unit fully assembled, use the special tool.
Specific tooling
020478Y
Punch for driven pulley roller casing
001467Y002
Driver for OD 73 mm bearing
- Install a new ball bearing using the special tool.
Specific tooling
020376Y
Adaptor handle
020477Y
37 mm adaptor
020363Y
20-mm guide
- Insert the Seeger lock ring.
Refitting the driven pulley
- Insert the new oil guards
- Insert the new O-rings
N.B.
O-RINGS ARE OF TWO SIZES. THE LARGE ONE IS INSTALLED ON THE MACHINING END RA-
DIUS, AT THE BASE OF THE HALF-PULLEY.
- Install the half-pulley on the bushing being careful
not to damage the top sealing ring during the in-
troduction.
- Make sure the pins and collar are not worn, re-
assemble the pins and collar.
- Using a bent beak greaser, lubricate the driven pulley unit with about 10 gr. of grease, this operation
should be carried out through one of the two holes into the bushing to obtain the exit of the grease from
the opposite hole. This operation is necessary to avoid the presence of grease beyond the O-rings.
Recommended products
AGIP GREASE SM 2
Grease for the C-ring of the tone wheel
Beverly 500 i.e.
Engine
ENG - 63
Summary of Contents for Beverly 500 i.e.
Page 1: ...WORKSHOP MANUAL 633387 Beverly 500 i e...
Page 5: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Page 17: ...INDEX OF TOPICS MAINTENANCE MAIN...
Page 32: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Page 51: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Page 54: ...INDEX OF TOPICS ENGINE ENG...
Page 162: ...Countershaft fixing nut 25 29 Engine Beverly 500 i e ENG 162...
Page 163: ...INDEX OF TOPICS INJECTION INJEC...
Page 260: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Page 284: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Page 301: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Page 310: ...INDEX OF TOPICS CHASSIS CHAS...
Page 329: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Page 333: ...INDEX OF TOPICS TIME TIME...