YES go to 16 NO go to 15
15
- Check cable harness and connectors more carefully.
16
- Connect the control unit connector.
Set the switch to «
ON
» with switch to «
RUN
» and side stand raised. Repeat the «
ON
» «
OFF
» «
ON
»
switching.
Check the presence of voltage pulses on the Stepper command lines.
Set-up for direct voltage measurements.
N.B.
PULSES ARE USED TO CHANGE THE STEPPER POSITION.
Electric characteristic
14-24 =
V (pulses for a few seconds)
6-21 =
V (pulses for a few seconds)
After reaching the optimum position, the power
supply voltage becomes null.
YES go to 17 NO go to 18
17
- The Stepper circuit is efficient.
18
- Check the control unit connector. Replace the control unit, if necessary.
Beverly 500 i.e.
Injection
INJEC - 259
Summary of Contents for Beverly 500 i.e.
Page 1: ...WORKSHOP MANUAL 633387 Beverly 500 i e...
Page 5: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Page 17: ...INDEX OF TOPICS MAINTENANCE MAIN...
Page 32: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Page 51: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Page 54: ...INDEX OF TOPICS ENGINE ENG...
Page 162: ...Countershaft fixing nut 25 29 Engine Beverly 500 i e ENG 162...
Page 163: ...INDEX OF TOPICS INJECTION INJEC...
Page 260: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Page 284: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Page 301: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Page 310: ...INDEX OF TOPICS CHASSIS CHAS...
Page 329: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Page 333: ...INDEX OF TOPICS TIME TIME...