- Insert the belt on the camshaft control timing rim.
- Insert the timing rim on the camshaft checking
that the references are aligned.
N.B.
DURING THE STROKE CHECK, KEEP THE BELT TEN-
SIONED BY PRESSING ON THE TIGHTENER COMPART-
MENT SIDE.
- Install the counterweight mass.
- Centre using the bell fastening screw.
- Lock the mass fixing screws to the prescribed
torque, using the recommended product.
Recommended products
Loctite 243
Medium strength threadlock
Medium Loctite 243 threadlock
Locking torques (N*m)
Counterweight screw
7 to 8.5
- Remove the central screw.
- Install the valve lifting mass being careful to the
proper positioning of the travel end ring.
- Lubricate the mass and de-compressor control
pin.
- Install the return spring and load it by about 3/4
turn.
Engine
Beverly 500 i.e.
ENG - 130
Summary of Contents for Beverly 500 i.e.
Page 1: ...WORKSHOP MANUAL 633387 Beverly 500 i e...
Page 5: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Page 17: ...INDEX OF TOPICS MAINTENANCE MAIN...
Page 32: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Page 51: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Page 54: ...INDEX OF TOPICS ENGINE ENG...
Page 162: ...Countershaft fixing nut 25 29 Engine Beverly 500 i e ENG 162...
Page 163: ...INDEX OF TOPICS INJECTION INJEC...
Page 260: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Page 284: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Page 301: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Page 310: ...INDEX OF TOPICS CHASSIS CHAS...
Page 329: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Page 333: ...INDEX OF TOPICS TIME TIME...