CHARGE THE BATTERY BEFORE USE TO ENSURE OPTIMUM PERFORMANCE. FAILURE TO
CHARGE THE BATTERY ADEQUATELY BEFORE BEING PUT INTO OPERATION WILL LEAD TO
A PREMATURE FAILURE OF THE BATTERY.
Connectors
Dashboard
•
The instrument panel is provided with
two connectors (A with 8 pins and B
with 6 pins) shown in the figure.
CONNECTOR A
Specification
Desc./Quantity
1
Left direction warning light
2
Battery negative
3
Battery positive
4
Water thermometer
5
Right direction warning light
6
Preset indicator
7
Fuel gauge
8
Low fuel warning light
CONNECTOR B
Specification
Desc./Quantity
1
High-beam lamp warning light
2
Ground lead
3
Engine control warning light
4
Engine oil pressure warning light
5
+ battery under permanent power supply
6
Instrument panel lighting and headlamp warning light
Beverly 500 i.e.
Electrical system
ELE SYS - 49
Summary of Contents for Beverly 500 i.e.
Page 1: ...WORKSHOP MANUAL 633387 Beverly 500 i e...
Page 5: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Page 17: ...INDEX OF TOPICS MAINTENANCE MAIN...
Page 32: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Page 51: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Page 54: ...INDEX OF TOPICS ENGINE ENG...
Page 162: ...Countershaft fixing nut 25 29 Engine Beverly 500 i e ENG 162...
Page 163: ...INDEX OF TOPICS INJECTION INJEC...
Page 260: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Page 284: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Page 301: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Page 310: ...INDEX OF TOPICS CHASSIS CHAS...
Page 329: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Page 333: ...INDEX OF TOPICS TIME TIME...