12
- Check and restore the earth insulation of the control unit line 19 and of the pump remote control
switch line 85.
YES go to 14
13
- Install the special tool between control unit and the injection system.
YES go to 15
Specific tooling
020481Y
Control unit interface wiring
14
- Delete the code and check from the beginning.
15
- Set the switch to "
ON
" with switch to "
RUN
"
and side stand raised. Wait more than two sec-
onds and check the following conditions:
19 - 23 = battery voltage
YES go to 16 NO go to 17
16
- Replace the control unit.
17
- Check the presence of voltage (+ batt.) be-
tween pin 86 of the pump remote control switch
and pin 23 of the control unit. Fix the wiring, if re-
quired. Check the relay coil continuity.
85 - 86 = 100 ± 50
Ω
18
- Check the efficiency of the 10 A fuse no. 2
YES go to 20 NO go to 19
Injection
Beverly 500 i.e.
INJEC - 196
Summary of Contents for Beverly 500 i.e.
Page 1: ...WORKSHOP MANUAL 633387 Beverly 500 i e...
Page 5: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Page 17: ...INDEX OF TOPICS MAINTENANCE MAIN...
Page 32: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Page 51: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Page 54: ...INDEX OF TOPICS ENGINE ENG...
Page 162: ...Countershaft fixing nut 25 29 Engine Beverly 500 i e ENG 162...
Page 163: ...INDEX OF TOPICS INJECTION INJEC...
Page 260: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Page 284: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Page 301: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Page 310: ...INDEX OF TOPICS CHASSIS CHAS...
Page 329: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Page 333: ...INDEX OF TOPICS TIME TIME...